Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
LR-N18-0056, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | 25 July 2018 | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
ML18044A007 | 9 May 2017 | Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 9, Auxiliary Systems |
ML15069A112 | 17 April 2015 | G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design |
ML12215A314 | 17 April 2015 | Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML12215A283 | 17 April 2015 | G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML14332A154 | 12 February 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) |
LR-N14-0155, PSEG Nuclear LLC, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA- | 25 June 2014 | PSEG Nuclear LLC, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13- |
LR-N14-0035, PSEG Nuclear Llc'S Seismic Hazard and Screening Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima... | 28 March 2014 | PSEG Nuclear Llc'S Seismic Hazard and Screening Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima... |
LR-N12-0156, Submittal of Updated Final Safety Analysis Report, Revision 26, Salem Units 1 & 2 Technical Specification Bases Changes, 10 CFR 54.37(b) Review Results and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10, Revision 82 | 21 May 2012 | Submittal of Updated Final Safety Analysis Report, Revision 26, Salem Units 1 & 2 Technical Specification Bases Changes, 10 CFR 54.37(b) Review Results and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10, Revision 82 |
ML11203A078 | 13 July 2011 | Independent Spent Fuel Storage Installation, 10 CFR 72.212 Evaluation Report, Revision 6 |
LR-N11-0173, Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark I Primary Containment Systems and Without Dedicated Class 1E Power for Cooling Elevated Irradiated Used Fuel... | 3 June 2011 | Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark I Primary Containment Systems and Without Dedicated Class 1E Power for Cooling Elevated Irradiated Used Fuel... |
IR 05000354/2011009 | 13 May 2011 | IR 05000354/2011009; 04/14/2011 - 04/20/2011; Hope Creek Generating Station; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event |
ML102510199 | 31 August 2010 | Independent Spent Fuel Storage Installation, 10 CFR 72.212 Evaluation Report, Revision 5 |
ML101550280 | 27 May 2010 | Independent Spent Fuel Storage Installation, 10 CFR 72.212 Evaluation Report, Revision 4 |
IR 05000354/2009007 | 23 November 2009 | IR 05000354-09-007, on 09/14/09 - 10/09/09, for Hope Creek; Component Design Bases Inspection Report |
IR 05000272/2005007 | 2 May 2005 | IR 05000272-05-007, IR 05000311-05-007, IR 05000354-05-006, on 02/28/2005 - 03/18/2005, Salem Units 1 and 2 and Hope Creek; Biennial Baseline Inspection of the Identification and Resolution of Problems; Problem Identification and Resolution |
LR-N04-0069, Request for Change to Technical Specifications Oscillation Power Range Monitor (Oprm), Hope Creek Generating Station | 31 March 2004 | Request for Change to Technical Specifications Oscillation Power Range Monitor (Oprm), Hope Creek Generating Station |
ML20198N390 | 28 December 1998 | Application for Amend to License NPF-57,permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys |
ML20198N416 | 12 November 1998 | MSIV Alternate Leakage Treatment Pathway Seismic Evaluation |
ML20203B684 | 31 December 1997 | Monthly Operating Rept for Dec 1997 & Jan 1998 for Hope Creek Generation Station,Unit 1,summary of Changes,Tests & Experiments |
ML20199D343 | 13 November 1997 | Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support |
ML18102A793 | 21 January 1997 | Event Classification Guide,Technical Basis, Salem Generating Station |
ML20115B779 | 3 July 1996 | Final Draft, Hope Creek Event Classification Guide, Sections 1-9 |
ML20091M991 | 15 October 1995 | Event Classification Guide HCGS, Including Revised Eals, Technical Basis Document & NUMARC EAL-to-Hope Creek Comparison Summary |
ML20071J980 | 15 July 1994 | Revised Hope Creek Event Classification Guide |
ML20065H253 | 7 April 1994 | Forwards Results of Util Evaluation That Supports Permanent Use of Transportable Tube Trailers & to Utilize Existing Lox Tank |
ML20127K709 | 14 January 1993 | Forwards Plant Specific MSL & Condenser Seismic Design Evaluation to Be Used to Suppl Section 6.7 of NEDC-31858P |
ML20094J950 | 29 February 1992 | Summary of Changes,Tests & Experiments for Hope Creek Generating Station Unit 1,Jan & Feb 1992 |
ML20087E155 | 31 December 1991 | Nonproprietary Rev 1 to BWROG Rept for Increasing MSIV Leakage Rate Limits & Elimination of Leakage Control Sys |
ML20086G549 | 25 November 1991 | Proposed Tech Specs Section 3.6.1.2 Re Allowable Leak Rate for MSIVs |
ML20207E529 | 18 December 1986 | Responds to NRC Re Violations Noted in Insp Rept 50-354/86-45.Corrective Actions:Util Reviewed & Evaluated Sample Vial Positioning & Alignment.Change to Positioning & Alignment to Be Completed in Second Quarter 1987 |
ML20151Y814 | 4 February 1986 | Part 21 Rept Re Colt-Pielstick Engine Tripping Out on High Speed When Started for Test Purposes at Seabrook.Caused by Source of Air Pressure Staying On.Engines Will Be Modified to Positively Vent Air from Rack Boost Cylinder |
ML20125E631 | 23 May 1978 | Rev a to Seismic Test Plan of Four Motor-Driven Dampers & Three Control Boxes |