Semantic search

Jump to navigation Jump to search
 Issue dateTitle
LR-N18-0056, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions25 July 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
ML18044A0079 May 2017Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 9, Auxiliary Systems
ML15069A11217 April 2015G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design
ML12215A31417 April 2015Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML12215A28317 April 2015G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML14332A15412 February 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents)
LR-N14-0155, PSEG Nuclear LLC, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-25 June 2014PSEG Nuclear LLC, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-
LR-N14-0035, PSEG Nuclear Llc'S Seismic Hazard and Screening Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima...28 March 2014PSEG Nuclear Llc'S Seismic Hazard and Screening Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima...
LR-N12-0156, Submittal of Updated Final Safety Analysis Report, Revision 26, Salem Units 1 & 2 Technical Specification Bases Changes, 10 CFR 54.37(b) Review Results and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10, Revision 8221 May 2012Submittal of Updated Final Safety Analysis Report, Revision 26, Salem Units 1 & 2 Technical Specification Bases Changes, 10 CFR 54.37(b) Review Results and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10, Revision 82
ML11203A07813 July 2011Independent Spent Fuel Storage Installation, 10 CFR 72.212 Evaluation Report, Revision 6
LR-N11-0173, Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark I Primary Containment Systems and Without Dedicated Class 1E Power for Cooling Elevated Irradiated Used Fuel...3 June 2011Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark I Primary Containment Systems and Without Dedicated Class 1E Power for Cooling Elevated Irradiated Used Fuel...
IR 05000354/201100913 May 2011IR 05000354/2011009; 04/14/2011 - 04/20/2011; Hope Creek Generating Station; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
ML10251019931 August 2010Independent Spent Fuel Storage Installation, 10 CFR 72.212 Evaluation Report, Revision 5
ML10155028027 May 2010Independent Spent Fuel Storage Installation, 10 CFR 72.212 Evaluation Report, Revision 4
IR 05000354/200900723 November 2009IR 05000354-09-007, on 09/14/09 - 10/09/09, for Hope Creek; Component Design Bases Inspection Report
IR 05000272/20050072 May 2005IR 05000272-05-007, IR 05000311-05-007, IR 05000354-05-006, on 02/28/2005 - 03/18/2005, Salem Units 1 and 2 and Hope Creek; Biennial Baseline Inspection of the Identification and Resolution of Problems; Problem Identification and Resolution
LR-N04-0069, Request for Change to Technical Specifications Oscillation Power Range Monitor (Oprm), Hope Creek Generating Station31 March 2004Request for Change to Technical Specifications Oscillation Power Range Monitor (Oprm), Hope Creek Generating Station
ML20198N39028 December 1998Application for Amend to License NPF-57,permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys
ML20198N41612 November 1998MSIV Alternate Leakage Treatment Pathway Seismic Evaluation
ML20203B68431 December 1997Monthly Operating Rept for Dec 1997 & Jan 1998 for Hope Creek Generation Station,Unit 1,summary of Changes,Tests & Experiments
ML20199D34313 November 1997Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support
ML18102A79321 January 1997Event Classification Guide,Technical Basis, Salem Generating Station
ML20115B7793 July 1996Final Draft, Hope Creek Event Classification Guide, Sections 1-9
ML20091M99115 October 1995Event Classification Guide HCGS, Including Revised Eals, Technical Basis Document & NUMARC EAL-to-Hope Creek Comparison Summary
ML20071J98015 July 1994Revised Hope Creek Event Classification Guide
ML20065H2537 April 1994Forwards Results of Util Evaluation That Supports Permanent Use of Transportable Tube Trailers & to Utilize Existing Lox Tank
ML20127K70914 January 1993Forwards Plant Specific MSL & Condenser Seismic Design Evaluation to Be Used to Suppl Section 6.7 of NEDC-31858P
ML20094J95029 February 1992Summary of Changes,Tests & Experiments for Hope Creek Generating Station Unit 1,Jan & Feb 1992
ML20087E15531 December 1991Nonproprietary Rev 1 to BWROG Rept for Increasing MSIV Leakage Rate Limits & Elimination of Leakage Control Sys
ML20086G54925 November 1991Proposed Tech Specs Section 3.6.1.2 Re Allowable Leak Rate for MSIVs
ML20207E52918 December 1986Responds to NRC Re Violations Noted in Insp Rept 50-354/86-45.Corrective Actions:Util Reviewed & Evaluated Sample Vial Positioning & Alignment.Change to Positioning & Alignment to Be Completed in Second Quarter 1987
ML20151Y8144 February 1986Part 21 Rept Re Colt-Pielstick Engine Tripping Out on High Speed When Started for Test Purposes at Seabrook.Caused by Source of Air Pressure Staying On.Engines Will Be Modified to Positively Vent Air from Rack Boost Cylinder
ML20125E63123 May 1978Rev a to Seismic Test Plan of Four Motor-Driven Dampers & Three Control Boxes