Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20339A013 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1 Thru 5.8 |
ML19150A465 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 Thru 5.8 |
ML20311A550 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure | 26 May 2016 | Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure |
ML16180A156 | 5 May 2016 | Revision 26 to the Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML14099A196 | 31 March 2014 | Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. |
ML13074A056 | 8 March 2013 | Supplement to Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events |
ML13073A155 | 8 March 2013 | Supplement to Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation |
ML13066A171 | 28 February 2013 | R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events |
ML13066A172 | 28 February 2013 | R. E. Ginna, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation |
ML092100301 | 10 November 2008 | Updated Final Safety Analysis Report, Rev. 21, Chapter 4, Reactor Through Chapter 6, Engineered Safety Features |
ML080710041 | 29 February 2008 | R.E. Ginna, Supplement Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML043450332 | 3 December 2004 | R. E. Ginna, Response to Request for Additional Information (RAI) Dated November 9, 2004, Regarding the Proposed Control Room Emergency Air Treatment System (Creats) Modification |
ML022210441 | 30 July 2002 | R. E. Ginna Nuclear Power Plant Application for Renewed Operating License, Volume 1, Section 2.0, Pages 2-155 - 2-372 |
ML17264A302 | 31 July 1995 | 1995 Rept of Facility Change,Tests & Experiments Conducted Without Prior Approval for Aug 1995 - Jul 1995 Under Provisions of 10CFR50.59. |
ML17309A558 | 1 November 1994 | Forwards Draft Safety Evaluation SEV-1019,Rev a, Containment Structural Mods Wbs 4 & Draft Rev C to DC-10034A, Design Criteria Ginna Station Containment Structural Mods Wbs 4. |
ML17263A831 | 26 September 1994 | Draft Rev C to Design Criteria Ginna Station Containment Structural Mods Wbs 4. |
IR 05000244/1991201 | 30 March 1994 | Forwards Summary of Conclusions of Assessment of Three NRC Concerns Discussed in 940128 Telcon Re SWS & Swsopi Insp 50-244/91-201 Dtd 920130 |
ML17263A568 | 30 March 1994 | Forwards Summary of Conclusions of Assessment of Three NRC Concerns Discussed in 940128 Telcon Re SWS & Swsopi Insp 50-244/91-201 Dtd 920130 |
ML17262B143 | 31 July 1992 | Corrected 1992 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1991 Through Jul 1992. |
ML17309A506 | 31 July 1992 | 1992 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1991 Through Jul 1992. W/921218 Ltr |
ML17256A660 | 22 April 1983 | Structural Reanalysis Program for Re Ginna Nuclear Power Plant. |
ML17250A751 | 1 September 1980 | EWR-2512,Revision 1 to Design Criteria for Seismic Upgrade Program |
ML18142B985 | 30 January 1976 | R. E. Ginna - Letter Transmitting 3 Signed Originals and 19 Copies of Document Entitled Application for Amendment to Operating License Along with 40 Copies of Proposed Change to Technical Specification 3.8.1 |
ML18143A104 | 5 October 1971 | R.E Ginna Unit 1, Amendment No. 2 to Technical Supplement Accompanying Application to Increase Power |