Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20339A01320 November 20209 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1 Thru 5.8
ML19150A46510 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 Thru 5.8
ML20311A5506 November 20172017 Q1-Q4 ROP Inspection Findings
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure26 May 2016Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure
ML16180A1565 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML14099A19631 March 2014Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.
ML13074A0568 March 2013Supplement to Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events
ML13073A1558 March 2013Supplement to Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation
ML13066A17128 February 2013R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events
ML13066A17228 February 2013R. E. Ginna, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation
ML09210030110 November 2008Updated Final Safety Analysis Report, Rev. 21, Chapter 4, Reactor Through Chapter 6, Engineered Safety Features
ML08071004129 February 2008R.E. Ginna, Supplement Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML0434503323 December 2004R. E. Ginna, Response to Request for Additional Information (RAI) Dated November 9, 2004, Regarding the Proposed Control Room Emergency Air Treatment System (Creats) Modification
ML02221044130 July 2002R. E. Ginna Nuclear Power Plant Application for Renewed Operating License, Volume 1, Section 2.0, Pages 2-155 - 2-372
ML17264A30231 July 19951995 Rept of Facility Change,Tests & Experiments Conducted Without Prior Approval for Aug 1995 - Jul 1995 Under Provisions of 10CFR50.59.
ML17309A5581 November 1994Forwards Draft Safety Evaluation SEV-1019,Rev a, Containment Structural Mods Wbs 4 & Draft Rev C to DC-10034A, Design Criteria Ginna Station Containment Structural Mods Wbs 4.
ML17263A83126 September 1994Draft Rev C to Design Criteria Ginna Station Containment Structural Mods Wbs 4.
IR 05000244/199120130 March 1994Forwards Summary of Conclusions of Assessment of Three NRC Concerns Discussed in 940128 Telcon Re SWS & Swsopi Insp 50-244/91-201 Dtd 920130
ML17263A56830 March 1994Forwards Summary of Conclusions of Assessment of Three NRC Concerns Discussed in 940128 Telcon Re SWS & Swsopi Insp 50-244/91-201 Dtd 920130
ML17262B14331 July 1992Corrected 1992 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1991 Through Jul 1992.
ML17309A50631 July 19921992 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1991 Through Jul 1992. W/921218 Ltr
ML17256A66022 April 1983Structural Reanalysis Program for Re Ginna Nuclear Power Plant.
ML17250A7511 September 1980EWR-2512,Revision 1 to Design Criteria for Seismic Upgrade Program
ML18142B98530 January 1976R. E. Ginna - Letter Transmitting 3 Signed Originals and 19 Copies of Document Entitled Application for Amendment to Operating License Along with 40 Copies of Proposed Change to Technical Specification 3.8.1
ML18143A1045 October 1971R.E Ginna Unit 1, Amendment No. 2 to Technical Supplement Accompanying Application to Increase Power