Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML19350B579 | 2 January 2020 | Generation Station - Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4383; EPID L-2014-JLD-0045) |
GO2-19-027, License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System | 25 February 2019 | License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System |
ML17355A667 | 31 December 2017 | Amendment 64 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML17355A661 | 31 December 2017 | Amendment 64 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML16054A012 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 4 of 8 |
ML16054A008 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 1 of 8 |
ML16054A014 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 6 of 8 |
ML15355A509 | 21 December 2015 | Final Safety Analysis Report, Amendment 63, Chapter 9 - Auxiliary Systems |
ML15355A490 | 21 December 2015 | Final Safety Analysis Report, Amendment 63, Chapter 2 - Site Characteristics |
ML15355A489 | 21 December 2015 | Final Safety Analysis Report, Amendment 63, Chapter 1 - Introduction and General Description of Plant |
ML15345A322 | 17 December 2015 | OEDO-15-00369 - 2.206 - Response, Emergency Enforcement Petition to Immediately Repair Known Crack at Columbia Generating Station |
GO2-15-175, Response to Order EA-13-109 - Overall Integrated Plan for Reliable Hardened Containment Vents Under Severe Accident Conditions, Phases 1 and 2, Revision 1 | 16 December 2015 | Response to Order EA-13-109 - Overall Integrated Plan for Reliable Hardened Containment Vents Under Severe Accident Conditions, Phases 1 and 2, Revision 1 |
IR 05000397/2015003 | 12 November 2015 | IR 05000397/2015003, July 1, 2015 Through September 30, 2015, Columbia Generating Station Exercise of Enforcement Discretion |
ML15316A834 | 12 November 2015 | IR 05000397/2015003, July 1, 2015 Through September 30, 2015, Columbia Generating Station Exercise of Enforcement Discretion |
GO2-16-021, R02 15-5462, Revision a, Expedited Seismic Evaluation Process (ESEP) Report | 27 October 2015 | R02 15-5462, Revision a, Expedited Seismic Evaluation Process (ESEP) Report |
ML15069A112 | 17 April 2015 | G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design |
ML12215A314 | 17 April 2015 | Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML12215A283 | 17 April 2015 | G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML14335A158 | 25 March 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) |
GO2-14-107, Energy Northwest'S Phase 1 Response to NRC Order EA-13-109, Overall Integrated Plan for Reliable Hardened Containment Vents Under Severe Accident Conditions | 30 June 2014 | Energy Northwest'S Phase 1 Response to NRC Order EA-13-109, Overall Integrated Plan for Reliable Hardened Containment Vents Under Severe Accident Conditions |
ML14148A358 | 30 April 2014 | G20130776/LTR-13-0866 - Transcript of 4/30/2014 Petition Review Board Conference Call with Charles Johnson, Oregon & Washington Physicians for Social Responsibility; 2.206 Petition Seismic Hazards at Columbia |
ML14121A028 | 30 April 2014 | NRR E-mail Capture - Testimony of Oregon and Washington Psr - Post-PRB Meeting for Columbia Seismic Concerns 2.206 Teleconference - 4/30/14 |
ML14106A001 | 15 April 2014 | NRR E-mail Capture - PRB Initial Recommendation (G20130776; MF3031) |
ML14105A027 | 15 April 2014 | NRR E-mail Capture - PRB Initial Recommendation (G20130776; MF3031) |
ML14083A679 | 24 March 2014 | NRR E-mail Capture - PRB Initial Recommendation (G20130776; MF3031) |
NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 | 4 March 2014 | FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 |
ML14051A671 | 4 March 2014 | FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 |
ML14010A293 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 1 - Introduction and General Description of Plant |
ML14010A294 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 2 - Site Characteristics |
ML14010A304 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 9 - Auxiliary Systems |
ML14010A297 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 3 - Design Criteria - Structures, Components, Equipment, and Systems, - Figure 3.6-21 Through Figure 3.12-4 |
GO2-13-035, Energy Northwest'S Response to NRC Order EA-12-050 Overall Integrated Plan for Reliable Hardened Containment Vents | 28 February 2013 | Energy Northwest'S Response to NRC Order EA-12-050 Overall Integrated Plan for Reliable Hardened Containment Vents |
ML12011A163 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML12011A156 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 3, Figure 3.6-16 Through 3.12-4 |
ML12011A153 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML12011A152 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML11318A274 | 14 November 2011 | NRC Staff'S Answer to Petition for Review of LBP-11-27 |
IR 05000397/2011004 | 2 November 2011 | IR 05000397-11-004 on 06/26/2011 09/24/2011 Columbia Generating Station, Integrated Resident & Regional Report; Equipment Alignment; Maintenance Effectiveness; Operability Evaluations; Evaluations of Changes, Tests, or Experiments & Permane |
GO2-11-092, Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis | 6 May 2011 | Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis |
NRC-2010-0131, Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions | 2 May 2011 | Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions |
IR 05000397/2010007 | 17 December 2010 | IR 0500397-10-007, on 10/18/2010 - 11/04/2010; Columbia Generating Station, Scoping of Nonsafety-Related Affecting Safety-Related Systems and Review of License Renewal Aging Management Programs |
GO2-07-045, Final Response to Generic Letter 2003-01 Control Room Habitability. | 2 March 2007 | Final Response to Generic Letter 2003-01 Control Room Habitability. |
GO2-06-119, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 72.214 for Dry Cask Storage | 14 September 2006 | Request for Exemption from Certain Requirements of 10 CFR 72.212 and 72.214 for Dry Cask Storage |
ML062720070 | 14 September 2006 | Request for Exemption from Certain Requirements of 10 CFR 72.212 and 72.214 for Dry Cask Storage |
ML17292B261 | 31 December 1997 | WNP-2 Annual Operating Rept for 1997. W/980226 Ltr |
ML17291A755 | 25 April 1995 | Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 |
ML17285A643 | 28 July 1989 | LER 89-027-00:on 890630,preliminary Engineering Evaluation Determined That Two Seismic Supports Missing on Each of Two PASS Containment Isolation Valves.Caused by Less than Adequate Work practices.W/890728 Ltr |
ML17285A700 | 28 July 1989 | LER 89-027-01:on 890630,determined That Two Seismic Supports Missing on PASS Containment Isolation Valves.Caused by Inadequate Work Practices & Training of Project Personnel. Tech Spec Action Statement 3.6.1 entered.W/890825 Ltr |
ML17277A773 | 15 August 1983 | Forwards Info Describing Actions Taken to Resolve Const Issues Identified in IE Insp Rept 50-397/83-29,per 830715 Submittal.Schedules for Completion & Status of Programs Addressing Broad Issues Also Encl |
IR 05000397/1983029 | 15 August 1983 | Forwards Info Describing Actions Taken to Resolve Const Issues Identified in IE Insp Rept 50-397/83-29,per 830715 Submittal.Schedules for Completion & Status of Programs Addressing Broad Issues Also Encl |