Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML15061A277 | 31 December 2014 | Westinghouse Freed A Hunter M | WCAP-17954-NP, Revision 0, Indian Point Unit 3 Heatup and Cooldown Limit Curves for Normal Operation. | Request |
NL-15-014, Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements | 12 February 2015 | Entergy Larry Coyle | Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements | Request |
ML15103A351 | 10 April 2015 | Pickett D Plant Licensing Branch I | NRR E-mail Capture - Acceptance Review for Indian Point 3 P/T and Ltops Amendment | Acceptance Review |
ML15226A159 | 3 September 2015 | Pickett D Plant Licensing Branch I | Issuance of Amendment Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements | Approval |
ML15230A410 | 19 September 2015 | Pickett D Plant Licensing Branch I | Request for Withholding Information from Public Disclosure | Withholding Request Acceptance |