Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML043240183 | 7 December 2004 | Clark R NRC/NRR/DLPM/LPD1 | R. E. Ginna Nuclear Power Plant, Withholding from Public Disclosure, WCAP-16311-P, Revision 0, Technical Justification for Eliminating Pressurizer Surge Line Rupture as the Structural Design Basis for the R. E. Ginna Nuclear Power Plant. | Other |
ML051080428 | 2 May 2005 | NRC/NRR/DLPM/LPD1 Skay D | R. E. Ginna, RAI, Fracture Mechanics Analysis | RAI |
ML051580149 | 28 May 2005 | Exelon Marlow T | Application of 10 CFR 50.90 Process for Use of Fracture Mechanics Analysis Per GDC-4 for R. E. Ginna Nuclear Power Plant | Request |
ML052430343 | 22 September 2005 | Milano P NRC/NRR/DLPM/LPD1 | R. E. Ginna, License Amendment, Application of Leak-Before-Break Methodology for Pressurizer Surge Line and Accumulator Lines | Other |