Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20207B6339 November 1977Stolz J
Office of Nuclear Reactor Regulation
Requests Determination If Throttle Valves Are Used to Obtain Required Flow Distribution in HPSI or LPSI Sys.If Throttle Valves Used,Tech Specs Should Be Changed within 60 Days to Incorporate Encl Surveillance RequirementsOther
ML20214S82316 December 1977NORTHEAST UTILITIES
Switzer D
Northeast Nuclear Energy
Application for Amend to License DPR-65,revising Tech Specs Page 3/4 5-5 to Increase Min Requirement for Trisodium Phosphate Dodecahydrate in Item 4.5.2.c.3Request
ML20214S82731 December 1977Northeast Nuclear EnergyProposed Tech Specs Pages 3/4 5-5,increasing Min Requirement for Trisodium Phosphate Dodecahydrate in Item 4.5.2.c.3Other
ML20207B63528 April 1978Grimes B
Eisenhut D
Office of Nuclear Reactor Regulation
Discusses Listed Action Taken to Close Issue Re Necessary Tech Spec Changes to PWR Licenses to Incorporate Hpsi/Lpsi Sys Throttle Valves Surveillance Requirements.List of PWR Plants & Sample Generic SER EnclOther
ML20244A47812 September 1978Counsil W
Northeast Nuclear Energy
Responds to 780821 NRC Ltr Re Violation Noted in Inspec Rept 50-366/78-26.Does Not Consider Item to Be a Noncompliance. Corrective Action:Slight Setpoint Adjustment of Refueling Water-Low Instru Channels.(Encl to 7810060211)Other
ML20064C23411 October 1978NORTHEAST UTILITIES
Counsil W
Forwards Proposed Tech Specs to Require Diesel Generator Start Time of Less than or Equal to 20Other