Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
B10875, Application for Amend to License DPR-65,changing Tech Specs to Add Definition of Accessible Tube to Section 4.4.5.1.4 Acceptance Criteria & to Clarify Action for Insp Results Into Category C-3 of Table 4.4-6 | 2 September 1983 | NORTHEAST UTILITIES Counsil W Northeast Nuclear Energy | Application for Amend to License DPR-65,changing Tech Specs to Add Definition of Accessible Tube to Section 4.4.5.1.4 Acceptance Criteria & to Clarify Action for Insp Results Into Category C-3 of Table 4.4-6 | Request |
ML20077P371 | 30 September 1983 | Northeast Nuclear Energy | Proposed Tech Specs Adding Definition of Accessible Tube to Section 4.4.5.1.4 Acceptance Criteria & Clarifying Action for Insp Results Into Category C-3 of Table 4.4-6 | Other |
ML20093A223 | 25 June 1984 | Counsil W Northeast Nuclear Energy | Forwards Addl Info Requested in NRC Re Util 830902 Request to Amend Tech Specs Concerning Steam Generator Tube Inservice Insp | Other |
ML20107B061 | 8 February 1985 | Northeast Nuclear Energy | Proposed Tech Specs,Reducing Total Number of Tubes Which May Be Excluded in Each Steam Generator & Incorporating Criteria Intended to Increase Assurance That Significantly Degraded Tubes Will Not Be Excluded | Other |
ML20107B039 | 8 February 1985 | NORTHEAST UTILITIES Counsil W Northeast Nuclear Energy | Application for Amend to License DPR-65,further Reducing Total Number of Tubes Which May Be Excluded in Each Steam Generator & Incorporating Criteria Intended to Increase Assurance That Degraded Tubes Will Not Be Excluded | Request |
B11708, Withdraws 850208 Request to Amend Tech Specs Re Criteria for Excluding Steam Generator Tubes from Eddy Current Testing.All Tubes Inspected | 10 September 1985 | Opeka J NORTHEAST UTILITIES Northeast Nuclear Energy | Withdraws 850208 Request to Amend Tech Specs Re Criteria for Excluding Steam Generator Tubes from Eddy Current Testing.All Tubes Inspected | Other |