Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
05000416/LER-1982-072, Forwards LER 82-072/01T-07 October 1982MISSISSIPPI POWER & LIGHT CO.
Mcgaughy J
Forwards LER 82-072/01T-0Other
AECM-82-490, Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 Encl18 October 1982Dale L
MISSISSIPPI POWER & LIGHT CO.
Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 EnclOther
AECM-82-510, Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation Listed26 October 1982Dale L
MISSISSIPPI POWER & LIGHT CO.
Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation ListedOther
AECM-82-528, Forwards Addl Info Re Instrument Air Quality,In Support of NRC Review of Util Response to NUREG-0737,Item II.K.3.28. Proposed Tech Specs & Design Details Will Be Provided 4 Months Prior to Startup Following First Refueling Outage9 November 1982Dale L
MISSISSIPPI POWER & LIGHT CO.
Forwards Addl Info Re Instrument Air Quality,In Support of NRC Review of Util Response to NUREG-0737,Item II.K.3.28. Proposed Tech Specs & Design Details Will Be Provided 4 Months Prior to Startup Following First Refueling OutageOther
ML20070H20920 December 1982Dale L
MISSISSIPPI POWER & LIGHT CO.
Discusses Util Responses to Recently Discussed Unresolved NRC Concerns Re Automatic Depressurization Sys Air SysOther
AECM-83-0179, Interim Deficiency Rept Re Installation of Noncorrosion Resistant Matl for Instrument Air Pipe Penetrations. Initially Reported on 830315.Design Change Will Be Implemented.Also Reported Per Part 2115 March 1983MISSISSIPPI POWER & LIGHT CO.
Mcgaughy J
Interim Deficiency Rept Re Installation of Noncorrosion Resistant Matl for Instrument Air Pipe Penetrations. Initially Reported on 830315.Design Change Will Be Implemented.Also Reported Per Part 21Other
AECM-82-581, Confirms Installation of Mechanical Pressure Gauge on Automatic Depressurization Sys Air Makeup Line & Performance of Associated Surveillance7 October 1983Dale L
MISSISSIPPI POWER & LIGHT CO.
Confirms Installation of Mechanical Pressure Gauge on Automatic Depressurization Sys Air Makeup Line & Performance of Associated SurveillanceOther
AECM-83-0672, Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months Anticipated24 October 1983Dale L
MISSISSIPPI POWER & LIGHT CO.
Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months AnticipatedOther
AECM-83-0759, Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 84053118 November 1983MISSISSIPPI POWER & LIGHT CO.
Mcgaughy J
Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531Other
AECM-85-0030, Forwards Addl Info Requested During 841206 Telcon Re Design & Operation of Automatic Depressurization Sys (ADS) Accumulators & Related Air sys.Long-term ADS Pneumatic Supply Makeup Connection Located in Auxiliary Bldg30 January 1985Dale L
MISSISSIPPI POWER & LIGHT CO.
Forwards Addl Info Requested During 841206 Telcon Re Design & Operation of Automatic Depressurization Sys (ADS) Accumulators & Related Air sys.Long-term ADS Pneumatic Supply Makeup Connection Located in Auxiliary BldgOther
AECM-85-0245, Responds to 850615 Request for Addl Info Re long-term Automatic Depressurization Sys Air Supply Makeup Connection, Per NUREG-0737,Item II.K.3.28.Access to Air Supply Connection Will Be Through Exterior Door 1A31615 August 1985Dale L
MISSISSIPPI POWER & LIGHT CO.
Responds to 850615 Request for Addl Info Re long-term Automatic Depressurization Sys Air Supply Makeup Connection, Per NUREG-0737,Item II.K.3.28.Access to Air Supply Connection Will Be Through Exterior Door 1A316Request