Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20072T049 | 31 January 1983 | GENERAL ELECTRIC CO. Hill R Charnley J Hilf G | Suppl Reload Licensing Submittal for Edwin I Hatch Nuclear Plant Unit 2,Reload 3 (Cycle 4) | Other |
ML20072T045 | 30 March 1983 | Southern Nuclear | Proposed Tech Spec Reflecting Changes to Reactor Core Design for Cycle 4 | Other |
ML20072T037 | 30 March 1983 | Southern Nuclear Head G | Application for Amend to License NPF-5 Changing Tech Specs to Reflect Changes to Reactor Core Design for Cycle 4 | Request |
ML20074A867 | 10 May 1983 | Southern Nuclear Gucwa L | Amends 830330 Submittal Re Extension of Malphgr Limits.Eccs Analysis Results Justify Operation of All Facility Fuel Types at Exposures Greater than 30,000 Mwd/St | Other |
ML20076E075 | 20 May 1983 | Southern Nuclear Gucwa L | Submits GE Info Assuring That crud-induced Local Corrosion Failures Will Not Occur During Cycle 4,in Response to NRC 830519 Request | Other |
ML20076E981 | 26 May 1983 | Southern Nuclear | Proposed Tech Specs Re Addl Surveillance Requirements for High Reactor Water Level Trip Function & Main Turbine Bypass Valves | Other |
ML20076E967 | 26 May 1983 | Southern Nuclear Beckham J | Application for Amend to License NPF-5,proposing Addl Tech Spec Surveillance Requirements for High Reactor Water Level Trip Function & Main Turbine Bypass Valves | Request |