Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
A02357, Forwards Cycle 5 Refueling Outage Steam Generator Profilometry Insp Results,Per Util .Results Confirm Integrity of Steam Generator Tubes & Supports & Assure Continued Applicability of Design Basis Analyses | 2 June 1982 | Counsil W Northeast Nuclear Energy | Forwards Cycle 5 Refueling Outage Steam Generator Profilometry Insp Results,Per Util .Results Confirm Integrity of Steam Generator Tubes & Supports & Assure Continued Applicability of Design Basis Analyses | Other |
B10581, Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage | 19 November 1982 | NORTHEAST UTILITIES Counsil W Northeast Nuclear Energy | Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage | Other |
B10672, Ro:On 830131,increased Primary to Secondary Leakage Rate Noted in Steam Generator 1.Caused by Expected Erosion in Leakage Area & Thermal Cycling Due to Power Transients & Plant Trips.Leakage Rate Measurements on 830202 Listed | 10 February 1983 | NORTHEAST UTILITIES Counsil W Sears C Northeast Nuclear Energy | Ro:On 830131,increased Primary to Secondary Leakage Rate Noted in Steam Generator 1.Caused by Expected Erosion in Leakage Area & Thermal Cycling Due to Power Transients & Plant Trips.Leakage Rate Measurements on 830202 Listed | Other |
ML20072H501 | 1 March 1983 | NORTHEAST UTILITIES | Proposed Tech Spec Revs Re Frequency of Steam Generator Inservice Insp | Other |
ML20071D777 | 1 March 1983 | NORTHEAST UTILITIES | Proposed Changes to Tech Spec 3.4.6.2.b,extending Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm Limit | Request |
B10712, Application for Amend to License DPR-65,changing Tech Spec 3.4.6.2.b to Extend Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm Limit | 1 March 1983 | NORTHEAST UTILITIES Counsil W Sears C Northeast Nuclear Energy | Application for Amend to License DPR-65,changing Tech Spec 3.4.6.2.b to Extend Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm Limit | Request |
B10724, Application for Amend to License DPR-65,revising Tech Specs Re Steam Generator Inservice Insp | 14 March 1983 | NORTHEAST UTILITIES Counsil W | Application for Amend to License DPR-65,revising Tech Specs Re Steam Generator Inservice Insp | Request |