Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
A02357, Forwards Cycle 5 Refueling Outage Steam Generator Profilometry Insp Results,Per Util .Results Confirm Integrity of Steam Generator Tubes & Supports & Assure Continued Applicability of Design Basis Analyses2 June 1982Counsil W
Northeast Nuclear Energy
Forwards Cycle 5 Refueling Outage Steam Generator Profilometry Insp Results,Per Util .Results Confirm Integrity of Steam Generator Tubes & Supports & Assure Continued Applicability of Design Basis AnalysesOther
B10581, Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage19 November 1982NORTHEAST UTILITIES
Counsil W
Northeast Nuclear Energy
Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 OutageOther
B10672, Ro:On 830131,increased Primary to Secondary Leakage Rate Noted in Steam Generator 1.Caused by Expected Erosion in Leakage Area & Thermal Cycling Due to Power Transients & Plant Trips.Leakage Rate Measurements on 830202 Listed10 February 1983NORTHEAST UTILITIES
Counsil W
Sears C
Northeast Nuclear Energy
Ro:On 830131,increased Primary to Secondary Leakage Rate Noted in Steam Generator 1.Caused by Expected Erosion in Leakage Area & Thermal Cycling Due to Power Transients & Plant Trips.Leakage Rate Measurements on 830202 ListedOther
ML20072H5011 March 1983NORTHEAST UTILITIESProposed Tech Spec Revs Re Frequency of Steam Generator Inservice InspOther
ML20071D7771 March 1983NORTHEAST UTILITIESProposed Changes to Tech Spec 3.4.6.2.b,extending Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm LimitRequest
B10712, Application for Amend to License DPR-65,changing Tech Spec 3.4.6.2.b to Extend Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm Limit1 March 1983NORTHEAST UTILITIES
Counsil W
Sears C
Northeast Nuclear Energy
Application for Amend to License DPR-65,changing Tech Spec 3.4.6.2.b to Extend Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm LimitRequest
B10724, Application for Amend to License DPR-65,revising Tech Specs Re Steam Generator Inservice Insp14 March 1983NORTHEAST UTILITIES
Counsil W
Application for Amend to License DPR-65,revising Tech Specs Re Steam Generator Inservice InspRequest