Semantic search

Jump to navigation Jump to search
 Issue dateTitleFromTo
NRC Generic Letter 1991-042 April 1991NRC Generic Letter 1991-004: Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel CyclePartlow J
Office of Nuclear Reactor Regulation
Information Notice 1996-38, Results of Steam Generator Tube Examinations21 June 1996Results of Steam Generator Tube ExaminationsGrimes B
Office of Nuclear Reactor Regulation
ML20236G7581 July 1998Proposed Tech Specs 4.7.7.e,removing Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen MonthsDominion
RC-98-0126, Application for Amend to License NPF-12,revising TS 4.7.7.e to Remove Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen Months1 July 1998Application for Amend to License NPF-12,revising TS 4.7.7.e to Remove Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen MonthsDominion
Gabe Taylor
Office of Information Resources Management
RC-06-0024, 1007930 - On-Line Monitoring of Instrument Channel Performance, Volume 3: Applications to Nuclear Power Plant Technical Specification Instrumentation31 December 20041007930 - On-Line Monitoring of Instrument Channel Performance, Volume 3: Applications to Nuclear Power Plant Technical Specification InstrumentationElectric Power Research Institute
Davis E
Rasmussen B
Shankar R
Edan Engineering Corp
Office of Nuclear Reactor Regulation
ML18249A1935 September 2018TS 4.3.3.6 SR LAR - Request for Additional InformationMichael Mahoney
Plant Licensing Branch II
South Carolina Electric & Gas Company
Maria Moore