Semantic search
Jump to navigation
Jump to search
Issue date | Title | From | To | |
---|---|---|---|---|
NRC Generic Letter 1990-05 | 15 June 1990 | NRC Generic Letter 1990-005: Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping | Partlow J Office of Nuclear Reactor Regulation | |
ML031140549 | 7 November 1991 | Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability | Partlow J Office of Nuclear Reactor Regulation | |
ML20095G079 | 22 September 1995 | Addendum 1 to Rev 2 to ISI Program Second Ten Yr Interval Units 2 & 3 for Peach Bottom Atomic Power Station | Exelon (FORMERLY PHILADELPHIA ELECTRIC | |
ML20134F034 | 4 February 1997 | Forwards Response to Re Request for Info Per 10CFR50.54(f) Concerning Adequacy & Availability of Design Bases Info | Exelon (FORMERLY PHILADELPHIA ELECTRIC Fetters D | Office of Information Resources Management |
ML20137C353 | 14 March 1997 | Forwards Response to GL 96-05 Re Periodic Verification of Design Basis Capability of SR MOVs | Exelon (FORMERLY PHILADELPHIA ELECTRIC Hunger G | Office of Information Resources Management |
ML20140D205 | 4 June 1997 | Integrated Insp Repts 50-277/97-02 & 50-278/97-02 on 970308-0503.Violations Noted.Major Areas Inspected: Operations,Surveillance,Maint,Engineering,Technical Support & Plant Support | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |
ML20249B612 | 17 June 1998 | Forwards Request for Relief from Specific Requirements of Article IWA-4000 of ASME Section XI Code,1980 Edition,W/ Addenda Through Winter 1981 Addendum.Approval Needed in Order to Install Temporary non-code Repair on HPCI Sys | Exelon (FORMERLY PHILADELPHIA ELECTRIC Geoffrey Edwards | Office of Information Resources Management |
ML022590527 | 30 September 2002 | SER Chapters 5 & 6 and Others | Office of Nuclear Reactor Regulation | |
IR 05000277/2008004 | 13 November 2008 | IR 05000277-08-004, 05000278-08-004; on 07/01/2008 - 09/30/2008; Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3; Operability Evaluations; Event Follow-up; Public Radiation Safety | Paul Krohn Reactor Projects Region 1 Branch 4 | Exelon AmerGen Pardee C |
RS-14-114, Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System. | 28 March 2014 | Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System. | Exelon James Barstow | Office of Nuclear Reactor Regulation Document Control Desk |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Exelon James Barstow | Office of Nuclear Reactor Regulation Document Control Desk |
RS-14-316, Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure | 29 October 2014 | Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure | Exelon James Barstow | Office of Nuclear Reactor Regulation Document Control Desk |
RS-15-068, Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Divsion 1,. | 5 February 2015 | Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Divsion 1,. | Exelon James Barstow | Office of Nuclear Reactor Regulation Document Control Desk |
RS-16-041, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1. | 28 January 2016 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1. | Exelon David Gudger | Office of Nuclear Reactor Regulation Document Control Desk |
RA-16-059, Proposed Alternative to Utilize Code Case N5134, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 14 June 2016 | Proposed Alternative to Utilize Code Case N5134, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Exelon James Barstow | Office of Nuclear Reactor Regulation Document Control Desk |
ML18086B110 | 26 March 2018 | Relief Requests Associated with the Use of Code Cases N-513-4 and N-513-3 for the Fifth Inservice Inspection Interval | Exelon James Barstow | Office of Nuclear Reactor Regulation Document Control Desk |