NRC Generic Letter 1988-0517 March 1988NRC Generic Letter 1988-005: Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR PlantsMiraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1988-077 April 1988NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.Miraglia F
Office of Nuclear Reactor Regulation
ML20154K83024 May 1988Forwards List of Program Elements & Provides Discussion of Circumstances or Measures in Place or Under Development at Plant,Per Generic Ltr 88-05.Probability of Abnormal Leakage, Rapidly Propagating Failure or Rupture of Boundary Very LowFay C
WEC Energy Group
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
NRC Generic Letter 1988-12, Removal of Fire Protection Requirements from Technical Specification2 August 1988NRC Generic Letter 1988-012: Removal of Fire Protection Requirements from Technical SpecificationsMiraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1991-1717 October 1991NRC Generic Letter 1991-017: Generic Safety Issue 29, Bolting Degradation or Failure in Nuclear Power Plants.Partlow J
Office of Nuclear Reactor Regulation
Information Notice 1986-10, Degradation of Reactor Coolant System Pressure Boundary Resulting from Boric Acid Corrosion.5 January 1995Degradation of Reactor Coolant System Pressure Boundary Resulting from Boric Acid Corrosion.Grimes B
Office of Nuclear Reactor Regulation
Information Notice 1986-10, Degradation of Reactor Coolant System Pressure Boundary Resulting From Boric Acid Corrosion.5 January 1995Degradation of Reactor Coolant System Pressure Boundary Resulting From Boric Acid Corrosion.Grimes B K
Office of Nuclear Reactor Regulation
NRC 2002-0029, Revised Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.18 April 2002Revised Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Nuclear Management Co
Warner M
Office of Nuclear Reactor Regulation
Document Control Desk
NRC 2002-0043, and Point Beach, Units 1 & 2 - NRC Bulletin 2002-01: Reactor Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity - 60 Day Response16 May 2002and Point Beach, Units 1 & 2 - NRC Bulletin 2002-01: Reactor Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity - 60 Day ResponseNuclear Management Co
Cayia A
Office of Nuclear Reactor Regulation
Document Control Desk
ML02322054218 November 2002RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.NRC/NRR/DLPM/LPD3
Spaulding D
Nuclear Management Co
Cayia F
NRC 2003-0006, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60-Day Response for Point Beach Nuclear Plant, Request for Additional Information (TAC No.MB4566 & MB4567)20 January 2003Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60-Day Response for Point Beach Nuclear Plant, Request for Additional Information (TAC No.MB4566 & MB4567)Nuclear Management Co
Cayia A
Office of Nuclear Reactor Regulation
Document Control Desk
NRC 2004-0066, Annual 10 CFR 50.59 Summary Report for 200330 June 2004Annual 10 CFR 50.59 Summary Report for 2003Nuclear Management Co
Koehl D
Office of Nuclear Reactor Regulation
Document Control Desk
ML05026023719 January 2005Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, Llc, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, UnitsVeronica Rodriguez
NRC/NRR/DRIP/RLEP
IR 05000266/200601325 January 2007IR 05000266-06-013, 05000301-06-013 and IR 05000266-06-014, 05000301-06-014; 10/01/2006 - 12/31/2006; Point Beach Nuclear Plant, Units 1 and 2; Flood Protection Measures, and Followup of Events and Notices of Enforcement DiscretionLouden P
NRC/RGN-III/DRP/RPB5
Nuclear Management Co
Koehl D
IR 05000266/20070038 August 2007IR 05000266-07-003 & 05000301-07-003; on 04/01/2007 - 06/30/2007; Point Beach Nuclear Plant, Units 1 & 2; Maintenance Effectiveness; Maintenance Risk Assessment & Emergent Work Evaluation; Post Maintenance Testing; Surveillance Testing; & EJamnes Cameron
NRC/RGN-III/DRP/RPB5
Nuclear Management Co
Koehl D
IR 05000266/200800311 August 2008
IR 05000266/201200819 December 2012IR 05000301-12-008, 11/5/2012 - 11/21/2012, Point Beach Nuclear Plant, Unit 2, Post Approval Site Inspection for License RenewalNRC/RGN-III/DRS/EB2
Stone A M
Point Beach
Meyer L
IR 05000301/201200819 December 2012IR 05000301-12-008, 11/5/2012 - 11/21/2012, Point Beach Nuclear Plant, Unit 2, Post Approval Site Inspection for License RenewalAnn Marie Stone
NRC/RGN-III/DRS/EB2
Point Beach
Meyer L
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 15 - Aging Management Programs and Time Limited Aging Analysis1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 15 - Aging Management Programs and Time Limited Aging AnalysisPoint BeachOffice of Nuclear Reactor Regulation
ML16251A1671 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 15 - Aging Management Programs and Time Limited Aging AnalysisPoint BeachOffice of Nuclear Reactor Regulation
ML21102A3462 April 2021Update to Final Safety Analysis Report, Chapter 15, Aging Management Programs and Time Limited Aging AnalysisPoint BeachOffice of Nuclear Reactor Regulation
ML21293A32812 August 20212021 Point Beach Initial License Exam As-Administered JPMsChuck Zoia
NRC/RGN-III/DRS/OLB
L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-029 June 2023Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02Point Beach
Strand D
Office of Nuclear Reactor Regulation
Document Control Desk
ML24116A05723 April 2024Periodic Update of the Updated Final Safety Analysis Report, Chapter 15, Aging Management Programs and Time Limited Aging AnalysisPoint BeachOffice of Nuclear Reactor Regulation