ML18144A0115 November 1985Requests Partial Exemption from GDC 4,eliminating Protection Against Dynamic Effects of Postulated Pipe Rupture on Primary Sys Components & Piping,Per Generic Ltr 84-04. Snubbers Will Be Removed During 1986 Refueling OutageDominion
Stewart W
Varga S
Office of Nuclear Reactor Regulation
Harold Denton
ML18144A04330 November 1985VEPCO Surry Units 1 & 2 RCS Leakage Detection Assessment for Elimination of RCS Main Loop Pipe Break Protective Devices.Dominion
ML18144A04430 November 1985VEPCO Surry Units 1 & 2 Safety Balance Assessment for Elimination of RCS Main Loop Pipe Break Protective Activities.Dominion
ML18144A04230 November 1985VEPCO Surry Units 1 & 2 RCS Loads & Component Support Margins Evaluation of Elimination of RCS Main Loop Pipe Break Protective Devices.Dominion
ML18144A0403 December 1985Forwards Repts in Support of 851105 Request for Exemption from GDC 4,eliminating Protection Against Dynamic Effects of Postulated Pipe Rupture on Primary Sys Components & PipingDominion
Stewart W
Varga S
Office of Nuclear Reactor Regulation
Harold Denton
ML18149A14430 April 1986Application for Amends to Licenses DPR-32 & DPR-37,revising Tech Specs to Add License Condition Authorizing Rev to Reactor Coolant Pump & Steam Generator Support Design to Mitigate Pipe Rupture EventsDominion
Stewart W
Office of Nuclear Reactor Regulation
Rubenstein L
Harold Denton
ML18149A14630 April 1986Proposed Tech Specs,Authorizing Rev to Reactor Coolant Pump & Steam Generator Support Design.Safety Evaluation EnclDominion
ML18149A24815 August 1986Forwards Final Response Re Implementation Status of Various Generic Items,Per 860430 RequestDominion
Stewart W
Office of Nuclear Reactor Regulation
Rubenstein L
Harold Denton
NRC Generic Letter 1989-2119 October 1989NRC Generic Letter 1989-021: Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) RequirementsPartlow J
Office of Nuclear Reactor Regulation
ML18153B99929 November 1989Forwards Response to Generic Ltr 89-21 Re Status of Implementation of USI Requirements at Facilities.Actions Re USI A-26, Reactor Vessel Pressure Transient Protection Completed Via Amends 55 & 56 to SER on 800304Dominion
Stewart W
Office of Information Resources Management
ML19058A58327 September 2018UFSAR Chapter 14-18Cotton K
Plant Licensing Branch II
Dominion
ML19095A60531 March 2019Enclosure 5 - Topical Report WCAP-15550-NP, Rev 2, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for Surry Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal PrograWestinghouse
Dominion
Office of Nuclear Reactor Regulation
ML21210A13530 September 20202 to Updated Final Safety Analysis Report, Chapter 15, Structures and Construction (EPID L-2020-LRO-0076) - RedactedDominionOffice of Nuclear Reactor Regulation
ML21175A18520 August 2021Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection LinesPlant Licensing Branch II
Vaughn Thomas
Dominion
Stoddard D