Semantic search

Jump to navigation Jump to search
 Issue dateTitleFromTo
ML20094C3385 April 1984Safety Balance for Elimination of RCS Main Loop Pipe Break Protective Devices,South Texas Project,Units 1 & 2. Response to NRC Request for Addl Info Re Leak Before Break Analysis EnclBECHTEL GROUP
INC.
ST-HL-AE-1096, Requests Exemption from 10CFR50,App A,Gdc 4 Re Elimination of Postulated Circumferential & Longitudinal Breaks in RCS Main Loop Piping & WCAP-10559 & WCAP-10560.Repts Withheld (Ref 10CFR2.790)17 July 1984Requests Exemption from 10CFR50,App A,Gdc 4 Re Elimination of Postulated Circumferential & Longitudinal Breaks in RCS Main Loop Piping & WCAP-10559 & WCAP-10560.Repts Withheld (Ref 10CFR2.790)Goldberg J
Creating Houston Lighting and Power Company
Office of Nuclear Reactor Regulation
Harold Denton
ST-HL-AE-1200, Application to Amend CPPR-128 & CPPR-129 to Permit Elimination of Postulated Circumferential & Longitudinal Breaks in RCS Main Loop Piping & Associated Dynamic Effects from Consideration in Structural Design Basis.Fee Paid1 March 1985Application to Amend CPPR-128 & CPPR-129 to Permit Elimination of Postulated Circumferential & Longitudinal Breaks in RCS Main Loop Piping & Associated Dynamic Effects from Consideration in Structural Design Basis.Fee PaidGoldberg J
Creating Houston Lighting and Power Company
Office of Nuclear Reactor Regulation
Harold Denton
ST-HL-AE-1617, Safety Balance for Elimination of Pressurizer Surge Line Break Protective Devices20 March 1986Safety Balance for Elimination of Pressurizer Surge Line Break Protective DevicesCreating Houston Lighting and Power Company
ML20211B38231 January 1987Safety Evaluation Report Related to the Operation of South Texas Project,Units 1 and 2.Docket Nos. 50-498 and 50-499. (Houston Lighting and Power Company)Office of Nuclear Reactor Regulation
NRC Generic Letter 1989-2119 October 1989NRC Generic Letter 1989-021: Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) RequirementsPartlow J
Office of Nuclear Reactor Regulation
ML19353B1884 December 1989Responds to Generic Ltr 89-21 Re Status of Implementation of USI Requirements.Implementation Considered Complete Where Activities Performed to Satify Assumptions Made in NRC Technical Resolution of Particular USIMcburnett M
Creating Houston Lighting and Power Company
Office of Information Resources Management