Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML21210A12930 September 20202 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (EPID L-2020-LRO-0076) - Redacted
ML19309D19930 October 2019Proposed License Amendment Request: Temporary, One Time 14-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F
ML17317A4647 November 2017Proposed License Amendment Request, Temporary, One Time 21-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C and Associated Cabling
ML17150A30223 May 2017Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01
ML0828905299 October 2008Proposed License Amendment Request, Removal of Main Control Room Bottled Air System Requirements
ML0817506907 July 2008License Amendments 260 & 260 Regarding Control Room Habitability
ML08142004717 June 2008Issuance of Amendments 259 and 259, Regarding the Increase of Maximum Service Water Temperature Limit from 95 F to 100 F
ML0708901592 April 2007Issuance of Amendments Regarding Main Control Room and Emergency Switchgear Room Air Conditioning System (TAC Nos. MD2501 & MD2502)
NRC Generic Letter 1984-015 January 1984NRC Generic Letter 1984-001: NRC Use of the Terms, Important to Safety and Safety Related
ML18139C0911 September 1982Technical Evaluation Rept on Adequacy of Station Electric Distribution Voltages for Surry Power Station,Units 1 & 2.