Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22140A07028 April 20221 to Updated Final Safety Analysis Report, Chapter 4, Reactor
ML22140A05928 April 20221 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML16319A01021 December 2016Issuance of Amendment No. 211, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies
ML16158A4731 June 20162016-06 Final Written Examination
ML16207A54328 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 4, Reactor
ML16207A55128 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls
NOC-AE-16003351, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies7 April 2016License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies
ML15343A12811 December 2015Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances)
NOC-AE-15003315, Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 203 December 2015Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20
NOC-AE-08002351, Revision 2 to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C25 September 2008Revision 2 to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C
NOC-AE-08002319, Response to RAI Revision to Proposed Amendment to TS 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C28 July 2008Response to RAI Revision to Proposed Amendment to TS 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C
NOC-AE-07002234, Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C28 January 2008Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C
ML03323022512 November 2003Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application.
ML20134Q13624 February 1997Ack Receipt of Faxes from Licensee Re Unit 2 Cycle 6 Rod Control Assembly Evaluation & Licensee Unit 2 SG Insp Results
ML20134L55531 July 1985Draft Safety Evaluation Re Elimination of Arbitrary Intermediate Pipe Breaks