Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22140A070 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML22140A059 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML16319A010 | 21 December 2016 | Issuance of Amendment No. 211, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies |
ML16158A473 | 1 June 2016 | 2016-06 Final Written Examination |
ML16207A543 | 28 April 2016 | Revision 18 to Updated Safety Analysis Report, Chapter 4, Reactor |
ML16207A551 | 28 April 2016 | Revision 18 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls |
NOC-AE-16003351, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies | 7 April 2016 | License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies |
ML15343A128 | 11 December 2015 | Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) |
NOC-AE-15003315, Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 | 3 December 2015 | Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 |
NOC-AE-08002351, Revision 2 to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C | 25 September 2008 | Revision 2 to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C |
NOC-AE-08002319, Response to RAI Revision to Proposed Amendment to TS 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C | 28 July 2008 | Response to RAI Revision to Proposed Amendment to TS 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C |
NOC-AE-07002234, Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C | 28 January 2008 | Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C |
ML033230225 | 12 November 2003 | Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. |
ML20134Q136 | 24 February 1997 | Ack Receipt of Faxes from Licensee Re Unit 2 Cycle 6 Rod Control Assembly Evaluation & Licensee Unit 2 SG Insp Results |
ML20134L555 | 31 July 1985 | Draft Safety Evaluation Re Elimination of Arbitrary Intermediate Pipe Breaks |