Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23241A58625 May 20237 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23241A27125 May 20237 to Updated Final Safety Analysis Report, Chapter 4, Reactor
ML23241A40025 May 20237 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML23241A49625 May 20237 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
ML21305A09811 October 20216 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
ML21305A09611 October 20216 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML21305A09311 October 20216 to Updated Final Safety Analysis Report, Chapter 4, Reactor
DCL-20-076, Technical Specification Bases10 September 2020Technical Specification Bases
ML20268A36330 June 20205 to Updated Final Safety Analysis Report, Chapter 4, Reactor
ML20268A36530 June 20205 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20268A36630 June 20205 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
DCL-18-070, Technical Specification Bases, Revision 1111 September 2018Technical Specification Bases, Revision 11
DCL-17-076, Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Position Requirements (License Amendment Request 17-01)28 September 2017Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Position Requirements (License Amendment Request 17-01)
ML17206A05931 December 2016Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML17206A06431 December 2016Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 7
ML17206A06031 December 2016Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 4, Reactor
DCL-17-038, Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 731 December 2016Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 7
DCL-17-038, Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 4, Reactor31 December 2016Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 4, Reactor
DCL-16-126, Revision 10 to Technical Specification Bases30 December 2016Revision 10 to Technical Specification Bases
ML16004A35617 December 2015Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.
DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 817 June 2015Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8
ML15176A52717 June 2015License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8
DCL-15-059, Technical Specification Bases, Revision 95 May 2015Technical Specification Bases, Revision 9
DCL-15-047, License Amendment Request 15-02 Revision of Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and Technical Specification 5.6.5. Core Operating Limits Report (Colr), For...16 April 2015License Amendment Request 15-02 Revision of Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and Technical Specification 5.6.5. Core Operating Limits Report (Colr), For...
DCL-13-092, Technical Specification Bases, Revision 816 September 2013Technical Specification Bases, Revision 8
DCL-12-050, Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement6 June 2012Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement
DCL-12-002, Revision to the Updated Final Safety Analysis Report Section 4.3.2.2, Power Distribution; and Technical Specification Bases 3.1.7, Rod Position Indication; 3.2.1, Heat Flux Hot Channel Factor (Fo(Z)),3.2.2,...5 January 2012Revision to the Updated Final Safety Analysis Report Section 4.3.2.2, Power Distribution; and Technical Specification Bases 3.1.7, Rod Position Indication; 3.2.1, Heat Flux Hot Channel Factor (Fo(Z)),3.2.2,...
DCL-07-097, License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)15 October 2007License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)
ML03323022512 November 2003Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application.
ML03190010010 July 2003Issuance of License Amendments 158 and 159 Revision to Technical Specifications Regarding Suspension of Positive Reactivity Additions
DCL-03-069, License Amendment Request 03-09, Revision of TS 3.1.7, Rod Position Indication 3.2.1, Heat Flux Hot Channel Factor, 3.2.4, Quadrant Power Tilt Ratio, & 3.3.1, Reactor Trip System Instrumentation for Beacon Implementation11 June 2003License Amendment Request 03-09, Revision of TS 3.1.7, Rod Position Indication 3.2.1, Heat Flux Hot Channel Factor, 3.2.4, Quadrant Power Tilt Ratio, & 3.3.1, Reactor Trip System Instrumentation for Beacon Implementation
DCL-02-038, License Amendment Request 02-02, Revision to Technical Specifications Re Suspension of Positive Reactivity Additions10 April 2002License Amendment Request 02-02, Revision to Technical Specifications Re Suspension of Positive Reactivity Additions