Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23241A94527 September 2023Generation Station, Units 1 and 2 Regulatory Audit Plan Supporting Review of the Equipment Qualification Portion of Limerick Digital Instrumentation and Controls License Amendment Request
ML22278A23919 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML22278A29419 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 09, Sections 3 Thru 5
ML22278A25819 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 09, Auxiliary Systems, Sections 1 Thru 2
ML22278A25119 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7, Control Systems Not Required for Safety
ML22278A25019 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22278A24219 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML22278A23519 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Section 7.3, Engineered Safety Feature Systems
ML22278A23119 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Through 7.5
ML22278A22719 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems
ML22278A22119 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6, All Other Instrumentation Systems Required for Safety
ML22278A22019 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems
ML21133A08729 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Through 7.2
ML21133A09029 April 20210 to Updated Final Safety Analysis Report, Chapter 8, Sections 1 Thru 3
ML21133A09129 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7, Control Systems Not Required for Safety
ML21133A09829 April 20210 to Updated Final Safety Analysis Report, Chapter 9, Sections 1 Thru 2
ML21133A10229 April 20210 to Updated Final Safety Analysis Report, Chapter 9, Sections 3 Thru 5
ML21133A08629 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Section 7.3, Engineered Safety Feature Systems
ML21133A08529 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Through 7.5
ML21133A08429 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems, Table of Contents
ML21133A08229 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6., All Other Instrumentation Systems Required for Safety
ML21133A07029 April 20210 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 Through 5.4
ML21133A05529 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems
RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments25 March 2021Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments
ML18285A60019 September 2018Revision 19 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML18285A60319 September 2018Revision 19 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML16357A13319 September 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML16357A15819 September 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML16357A15519 September 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML15296A4926 November 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review
RS-14-069, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-.31 March 2014Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-.
RS-12-172, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident19 November 2012Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML12056A04712 March 2012Enclosure 1 - Recommendation 2.1: Seismic
ML12056A04812 March 2012Enclosure 2 - Recommendation 2.1: Flooding
ML1106910958 April 2011Issuance of Amendments 201 & 163 Measurement Uncertainty Recapture Power Uprate and Standby Liquid Control System Changes
ML07255039331 October 2007License Amendment, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability.
ML02065031315 February 2002License Amendment Request 01-00129 Regarding Reactor Water Cleanup System Steam Leak Detection Instrumentation Setpoints
IR 05000352/19920814 December 1992Edsfi Repts 50-352/92-81 & 50-353/92-81 on Stated Date. Violations Noted.Major Areas Inspected:Review of Functionality of Electrical Distribution Sys
ML20214A87214 May 1987Final Response to FOIA Request for Documents.Forwards App a Document.Document Also Available in PDR
NRC Generic Letter 1987-0219 February 1987NRC Generic Letter 1987-002: Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Unresolved Safety Issue A-46
ML20129E79131 May 1985Safety Evaluation Report Related to the Operation of Limerick Generating Station,Units 1 and 2.Docket Nos. 50-352 and 50-353.(Philadelphia Electric Company)
ML20107M0859 November 1984Reply to NRC Answer to Applicant Petition for Commission Review of Alab 785,asserting Supplemental CWS Not safety- Related.Intervenor Requests That Commission Grant Petition for Review.Certificate of Svc Encl
ML20107M0729 November 1984Reply Re NRC Opposition to Stay on Grounds That Supplemental CWS Not safety-related.Stay Should Be Granted as Sought or Recharacterized as Motion to Set Aside
ML20107M0669 November 1984Motion for Leave to File Reply to NRC Brief in Opposition to 841109 Request for Stay.Staff Failed to Address Applicant Reliance on Supplemental Cooling Water Sys for safety-related Purposes
ML20093M81319 October 1984Requests Exemption from Requirement of 10CFR50,App A,Gdc 2 & 4 Re Protection of UHS from Effects of Tornado Missiles. Exemption Requested for Power Levels Not Exceeding 5% Full Power
ML20092H28921 June 1984Forwards Draft FSAR Changes Re Automatic Depressurization Sys Accumulators (TMI Item II.K.3.28).Rev Modifies Response Discussed in 840606 Telcon.Info Will Be Incorporated in Revised FSAR Scheduled for Release in Jul 1984