Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML15329A1818 December 2015Staff Assessment of Information Provided Pursuant of Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f)Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights..
LIC-14-0077, CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision17 June 2014CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision
IR 05000285/201301725 April 2014IR 05000285-13-017, July 8, 2013 Through March 13, 2014, Fort Calhoun Station - Manual Chapter 0350 Inspection Report and Final Significance Determination of White Finding and Notice of Violation
ML14115A21223 April 2014Petition to Intervene and Request for Adjudicatory Hearing by Sierra Club
ML14105A37322 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident
ML13273A29719 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 1 of 21
LIC-13-0105, License Amendment Request (LAR) 13-03, Request to Revise Updated Safety Analysis Report to Allow Implementation of Modification EC 55394, Raw Water Pump Operation and Safety Classification of Components During a Flood16 August 2013License Amendment Request (LAR) 13-03, Request to Revise Updated Safety Analysis Report to Allow Implementation of Modification EC 55394, Raw Water Pump Operation and Safety Classification of Components During a Flood
ML13203A07026 July 2013Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances)
LIC-13-0061, Omaha Public Power District - Exigent License Amendment Request 13-02 Revise Current Licensing Basis to Adopt a Revised Design Basis / Methodology for Addressing Design-Basis Tornado / Tornado Missile Impact21 July 2013Omaha Public Power District - Exigent License Amendment Request 13-02 Revise Current Licensing Basis to Adopt a Revised Design Basis / Methodology for Addressing Design-Basis Tornado / Tornado Missile Impact
IR 05000285/201300816 July 2013IR 05000285-13-008, on 01/14/2013 06/10/2013, Fort Calhoun Station, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input
ML12258A29314 September 2012FCS 2012002 Violation Denial Response Letter
IR 05000285/201200227 June 2012Acknowledgement of Receipt of Denial Violation in NRC Inspection Report 05000285/2012002
LIC-12-0080, Response to NRC Inspection Report 05000285/2012002, EA-2012-09511 June 2012Response to NRC Inspection Report 05000285/2012002, EA-2012-095
LIC-12-0056, License Amendment Request (LAR) 12-03, Proposed Change to Revise Operating Requirements for Technical Specification 2.16, River Level, & Establish Emergency Action Level Classification Criteria for External Flooding Events Under the Radi27 April 2012License Amendment Request (LAR) 12-03, Proposed Change to Revise Operating Requirements for Technical Specification 2.16, River Level, & Establish Emergency Action Level Classification Criteria for External Flooding Events Under the Radiolo
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML12056A04712 March 2012Enclosure 1 - Recommendation 2.1: Seismic
ML12056A04812 March 2012Enclosure 2 - Recommendation 2.1: Flooding
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
LIC-11-0017, License Amendment Request (LAR) 10-06, Proposed Change to Establish the Ultimate Heat Sink (UHS) Limiting Condition for Operation (LCO) and Addition of UHS Level and Temperature Surveillance Requirements4 March 2011License Amendment Request (LAR) 10-06, Proposed Change to Establish the Ultimate Heat Sink (UHS) Limiting Condition for Operation (LCO) and Addition of UHS Level and Temperature Surveillance Requirements
IR 05000285/200900630 December 2009IR 05000285-09-006; August 24-28, 2009, and September 8-18, 2009; Fort Calhoun Station: Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection
ML20128D45130 November 1992Safety Evaluation Accepting Evaluation of 120-day Response to Suppl 1 to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Unresolved Safety Issue A-46
ML20091C75431 July 1991Nonproprietary, Westinghouse ECCS Evaluation Model for Analysis of C-E NSSS, Topical Rept
NRC Generic Letter 1987-0219 February 1987NRC Generic Letter 1987-002: Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Unresolved Safety Issue A-46
NRC Generic Letter 1984-015 January 1984NRC Generic Letter 1984-001: NRC Use of the Terms, Important to Safety and Safety Related