Semantic search

Jump to navigation Jump to search
 Issue dateTitle
CNL-21-009, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative31 March 2022License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative
ML22049B3174 October 2021Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Hydrology, Water Quality, and Aquatic Biology - Redacted
ML21075A07630 April 2021Issuance of Amendment Nos. 316, 339, and 299 Regarding the Incorporation of the Tornado Missile Risk Evaluator Into the Licensing Basis
CNL-20-002, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (TS-BFN-529)17 July 2020Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (TS-BFN-529)
CNL-20-044, License Amendment Request to Incorporate Tornado Missile Risk Evaluation Into the Licensing Basis6 May 2020License Amendment Request to Incorporate Tornado Missile Risk Evaluation Into the Licensing Basis
ML19324C9874 October 2019Amendment 28 to Updated Final Safety Analysis Report, Chapter 2, Site - Redacted
ML19010A21218 March 2019Final Safety Evaluation for Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation
ML19010A27418 March 2019Final Safety Evaluation by the Office of Nuclear Reactor Regulation Topical Report- TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation, Calculation, CDQ0000002016000041 Tennessee Valley Authority
ML18057A63723 February 2018NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011)
ML16196A0885 August 2016Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation
ML15282A26121 September 2015Template of NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (Retyped)
NL-15-169, Browns Ferry, Units 1, 2, and 3, Template of NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (Retyped)21 September 2015Browns Ferry, Units 1, 2, and 3, Template of NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (Retyped)
ML15090A74521 April 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the NTTF Review of Insight
CNL-14-038, Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc31 March 2014Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12056A04812 March 2012Enclosure 2 - Recommendation 2.1: Flooding
ML12056A04712 March 2012Enclosure 1 - Recommendation 2.1: Seismic
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML11132A1185 May 2011Bellefonte, Units 1 and 2 - Proposed Regulatory Framework for the Possible Completion of Construction Activities
ML09173024218 August 2009License Amendment, the Amendments Revise the Technical Specifications (Tss) to Adopt the Content of Technical Specification Task Force (TSTF) Change Traveler TSTF-448, Revision 3, Control Room Habitability
ML0633504046 March 2007License Amendment, Five Percent Uprate (TAC No. MD3048) (TS-418)
ML05056033723 February 2005(BFN) - Response to Nrc'S Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-418 - Request for Extended Power Uprate Operation (Tac Nos MC3743 and MC3744)
ML05056015023 February 2005Response to NRC Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation
ML0716501681 April 1999NEI Report: RCP Lube Oil Collection System Current Trend Abstract, April 1999 (Revision 1)
ML02003017013 April 1993License Amendments 195, 210, & 167, Revising the Technical Specifications to Reflect a Design Change of Refuel Zone and Reactor Building Ventilation Radiation Monitoring System That Replaces Existing Analog Components
ML20155E7657 October 1988Responds to NRC Re Violations Noted in Insp Repts 50-259/88-16,50-260/88-16 & 50-296/88-16.Corrective Actions: Std Cable Insp & Tests MA-45,Step 6.10 Revised to Include Note Providing Crafts Personnel W/Adequate Instructions
ML20154K88912 September 1988Notice of Violation from Insp on 880501-0611.Violation Noted:Three Fire Brigade Members Who Entered Drywell for Fire Fighting Operations Not Qualified & Q-list Equipment Data Package (Sys 1) Not in Compliance W/Nuclear QA Manual
NRC Generic Letter 1987-0219 February 1987NRC Generic Letter 1987-002: Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Unresolved Safety Issue A-46
ML18026B1379 August 1984Forwards Response to NRC 831012 Request for Addl Info Re Reactor Protection Sys Power Monitoring Sys Design Mods. Tech Specs Will Be Submitted in future.W/12 Oversize Drawings.Aperture Cards Available in PDR
NRC Generic Letter 1984-015 January 1984NRC Generic Letter 1984-001: NRC Use of the Terms, Important to Safety and Safety Related
ML20078M24320 October 1983Forwards Responses to 830920 & 21 Requests for Addl Info Re Analog Instrumentation Installation.Startup Projected for 831128