Semantic search

Jump to navigation Jump to search
 Start dateSiteTitleDescription
IR 05000445/20130072 August 2013Comanche PeakIR 05000445-13-007; 05000446-13-007; 05/20/2013 - 06/20/2013; Comanche Peak Nuclear Power Plant, Units 1 and 2: Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection.
IR 05000498/200900224 April 2009South TexasIR 05000498-09-002, 05000499-09-002 01/01/2009 - 04/04/2009; South Texas Project Electric Generating Station, Units 1 and 2, Integrated Resident and Regional Report; Maintenance Risk Assessments, Operability Evaluations, and Surveillance Te
IR 05000443/200500522 July 2005SeabrookIR 05000443-05-005; on 4/1/2005-6/30/2005 for Seabrook Station, Unit 1; Post-Maintenance Testing
IR 05000443/200300329 July 2003SeabrookIR 05000443-03-003, 03/30/2003 Through 06/28/2003, FPL Energy Seabrook LLC, Seabrook, Nh; Heat Sink Performance, Operability Evaluations, and Surveillance Testing