Semantic search
Jump to navigation
Jump to search
Start date | Site | Title | Description | |
---|---|---|---|---|
ML22263A225 | 1 November 2022 | Farley | Issuance of Amendment Nos. 243 and 240 to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure | |
ML21216A316 | 23 August 2021 | Farley | Closeout of Bulletin 2012-01, Design Vulnerability in Electric Power System | |
ML21218A058 | 10 August 2021 | Farley | Correction to Issuance of Amendment Nos. 230 and 231 (Epids L-2020-LLA-0134 and L-2020-LLA-0232) | |
ML21202A206 | 26 July 2021 | Farley | Project Manager Assignment | |
ML21176A171 | 6 July 2021 | Farley | Summary of June 24, 2021, Public Meeting Regarding a Proposed LAR to Permanently Remove the Encapsulation Vessels Around Containment Sump Recirculation Valves | |
ML21131A026 | 23 June 2021 | Mcguire Catawba McGuire | Issuance of Amendments to Change Technical Specification 3.8.1, to Reduce Emergency Diesel Generator Maximum Voltage | |
ML20295A502 | 10 November 2020 | Farley | Temporary Exemption from Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0148 (COVID-19)) |