Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22314A2109 November 2022Written Communication as Required by Technical Specification 6.6.d(2), Other Reports, Regarding a Change in University of Missouri-Columbia Research Reactor Organization Involving the Reactor Facility Director
ML22290A00412 October 2022University of Missouri-Columbia Research Reactor, Reportable Event Report Pursuant to 20.2201(a)(ii) Regarding Loss of Licensed Material During ShipmentTime of Discovery
ML21298A19725 October 2021University of Missouri-Columbia Research Reactor - Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.g.6
ML21217A2985 August 2021University of Missouri-Columbia Research Reactor - Reportable Event Report Pursuant to 20.2203(a)(2)(iv)High Radiation Area
ML20287A5439 October 2020University of Missouri, Columbia Research Reactor - Written Report, in Accordance with IO CFR 71.1, as Required by IO CFR 71. 9 5(b) for NRC Docket 71-9338), Regarding Conditions in the Certificate of Compliance for the Safkeg-HS 3977A, Us
ML03203005417 July 2003Curators of University of Missouri, License No. R-103 LER for Airlock Door Malfunction That Occurred on 06/21/2003
ML02296027221 October 2002Event Report 02-04, Univ. of Missouri-Columbia Research Reactor Center Re Failure of Containment Airlock Door Control Circuit That Occurred on 09/24/02
ML02289009514 October 2002Letter Providing the University of Missouri Research Reactor Event Report for a mis-positioned Fuel Element That Was Discovered on 09/18/2002
ML02065036212 February 2002Event Report 02-01 from University of Missouri Research Reactor Center Re Instrument Malfunction That Resulted in a Deviation from Technical Specifications 3.3.a