Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23262A96713 December 2023Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1Probabilistic Risk Assessment
Incorporated by reference
Aging Management
Flow Accelerated Corrosion
License Renewal
Fire Protection Program
RA-23-0018, Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 14 May 2023Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1Weld Overlay
Nondestructive Examination
Incorporated by reference
Stress corrosion cracking
Dissimilar Metal Weld
RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2 February 2023Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)23 January 2023Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)
RA-22-0174, Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems.27 July 2022Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems.Non-Destructive Examination
Internal Flooding
Probabilistic Risk Assessment
Flow Accelerated Corrosion
Large early release frequency
Fire Protection Program
ML22019A13521 January 2022Proposed Alternative to Implement ASME Code Case OMN-24Incorporated by reference
Grace period
RA-21-0169, Relief Requests for Inservice Testing Plan - Sixth Interval29 July 2021Relief Requests for Inservice Testing Plan - Sixth IntervalSafe Shutdown
Incorporated by reference
Scaffolding
Grace period
RA-19-0418, Proposed Alternative for Inservice Inspection of Containment Post-Tensioning System Components6 May 2021Proposed Alternative for Inservice Inspection of Containment Post-Tensioning System ComponentsScaffolding
RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(411 February 2021Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(
RA-20-0328, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals19 January 2021Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection IntervalsProbabilistic Risk Assessment
Power change