Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20059L798 | 9 November 1993 | Ro:On 931026,reactor Started & Inadvertently Operated from 1350 to 1448 H W/O Period Channel Functioning Properly Due to Sticking of Trip Test Knob.Lecture Review of Startup, Power Change & Shutdown SOPs Will Be Performed | Power change |
ML20086G539 | 3 January 1984 | Ro:On 831229,during Connection of Cable from Log N Period Compensated Ion Chamber,Spurious Signal Occurred,Causing Reactor Scram.Caused by Failure to Reconnect Cable After Semiannual Check |