Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21349B35415 December 2021Attachment 4: Operational Quality Assurance Program Description, Revision 57Fitness for Duty
Offsite Dose Calculation Manual
Fire Barrier
Process Control Program
Pandemic
Fire Protection Program
Early Warning Fire Detection
Grace period
GO2-20-076, Reduction in Commitment to the Columbia Operation Quality Assurance Program Description18 May 2020Reduction in Commitment to the Columbia Operation Quality Assurance Program DescriptionCommercial Grade Dedication
Pandemic
COVID-19
ML17355A6582 May 2017Operational Quality Assurance Program Description (EN-QA-004), Rev. 52Offsite Dose Calculation Manual
Fire Barrier
Process Control Program
Fire Protection Program
Early Warning Fire Detection
Grace period
ML15355A48721 December 2015Revision 48 to Operational Quality Assurance Program Description (EN-QA-004)Offsite Dose Calculation Manual
Fire Barrier
Process Control Program
Fire Protection Program
Early Warning Fire Detection
Grace period
ML12011A14914 December 2011Columbia, Technical Specification (TS) Basis, Rev. 69, Licensee Controlled Specifications (LCS) Rev. 67 and Operational Quality Assurance Program Description (Oqapd), Rev. 44
GO2-03-165, Reduction of Commitment to the Operational Quality Assurance Program Description23 October 2003Reduction of Commitment to the Operational Quality Assurance Program DescriptionOffsite Dose Calculation Manual
Process Control Program