Start date | Status | Title | Request type | Estimated NRC review hours | Topic | |
---|---|---|---|---|---|---|
EPID:L-2023-LLL-0004 | 18 January 2023 | Approved Closed | Quality Assurance Program Manual Reduction in Commitment | LLL | ||
EPID:L-2022-LLA-0169 | 29 September 2022 | Open | Notice of Meeting with Entergy Operations, Inc. Regarding Waterford Steam Electric Station, Unit 3 | License Amendment | ||
EPID:L-2021-LLA-0119 | 20 July 2022 | Approved Closed | TSTF-569 | License Amendment | ||
EPID:L-2021-LLA-0165 | 8 July 2022 | Approved Closed | License Amendment | |||
EPID:L-2022-LLR-0054 | 30 June 2022 | Open | ASME Code Case N-752 | Relief Request | ||
EPID:L-2022-LRM-0043 | 9 June 2022 | Open | ASME Code Case N-752 | LRM | ||
EPID:L-2021-LLL-0025 | 22 December 2021 | Open | LLL | |||
EPID:L-2022-LLL-0009 | 30 November 2021 | Open | Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 | LLL | ||
EPID:L-2021-LLA-0183 | 6 October 2021 | Approved Closed | TSTF 554 | License Amendment | ||
EPID:L-2021-LLA-0166 | 23 September 2021 | Approved Closed | TSTF-541 | License Amendment | ||
EPID:L-2021-LLA-0122 | 19 July 2021 | Approved Closed | TSTF-577 | License Amendment | ||
EPID:L-2021-LLA-0093 | 22 June 2021 | Approved Closed | TSTF-563 | License Amendment | ||
EPID:L-2021-LLE-0046 | 15 June 2021 | Approved Closed | Exercise, State of Louisiana - Radiological Emergency Preparedness Final Report | Exemption Request | ||
EPID:L-2021-LLR-0042 | 7 June 2021 | Open | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI | Relief Request | ||
EPID:L-2021-LLA-0061 | 30 April 2021 | Approved Closed | License Amendment | |||
EPID:L-2021-LLA-0014 | 15 March 2021 | Approved Closed | TSTF-505 | License Amendment | ||
EPID:L-2020-LLR-0160 | 30 December 2020 | Open | Arkansas, Units 1 and 2; Grand Gulf, Unit 1; River Bend, Unit 1; and Waterford, Unit 3, Relief Request Number EN-20-RR-003, Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-711-2, Alternative Examination Cove | Relief Request | ||
EPID:L-2020-LLA-0279 | 18 December 2020 | Approved Closed | TSTF-505 TSTF-425, TSTF-505 | License Amendment | ||
EPID:L-2020-LRM-0109 | 4 December 2020 | Open | LRM | |||
EPID:L-2020-LRM-0110 | 4 December 2020 | Open | LRM | |||
EPID:L-2020-LLE-0186 | 12 November 2020 | Approved Closed | Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 Pandemic | Exemption Request | ||
EPID:L-2020-LLE-0130 | 27 August 2020 | Approved Closed | Exemption Request | |||
EPID:L-2020-LLR-0108 | 18 August 2020 | Open | Relief Request | |||
EPID:L-2020-LRM-0043 | 8 July 2020 | Open | LRM | |||
EPID:L-2019-LLA-0203 | 6 July 2020 | Approved Closed | (Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual | License Amendment | ||
EPID:L-2020-LLA-0122 | 26 June 2020 | Approved Closed | Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 | License Amendment | ||
EPID:L-2019-PMP-0068 | 22 June 2020 | Open | PMP | |||
EPID:L-2020-LRM-0016 | 12 March 2020 | Open | Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations | LRM | ||
EPID:L-2019-LRM-0093 | 8 January 2020 | Open | LRM | |||
EPID:L-2019-LLA-0230 | 24 October 2019 | Approved Closed | (Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements | License Amendment | ||
EPID:L-2019-LLA-0187 | 27 August 2019 | Approved Closed | TSTF-448 TSTF-541, TSTF-448 | License Amendment | 180 hours7.5 days <br />1.071 weeks <br />0.247 months <br /> | |
EPID:L-2019-LLR-0066 | 18 July 2019 | Approved Closed | CFR 50.55a Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 in Accordance with 10 CFR 50.55a(z)(2) | Relief Request | ||
EPID:L-2019-LLL-0017 | 14 March 2019 | Open | Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | LLL | ||
EPID:L-2019-LLR-0009 | 31 January 2019 | Open | ASME Code Case N-831-1 | Relief Request | 150 hours6.25 days <br />0.893 weeks <br />0.205 months <br /> | |
EPID:L-2019-LLR-0003 | 28 January 2019 | Open | Proposed Inservice Inspection Program Alternative WF3-RR-19-1 for Application of Dissimilar Metal Weld Full Structural Weld Overlay - Reactor Coolant System Cold Leg Drain Nozzles | Relief Request | ||
EPID:L-2018-LLR-0194 | 30 November 2018 | Approved Closed | Request for Relief from ASME Section XI Volumetric Examination Requirements - Third 10-Year Interval, W3-ISI-032 | Relief Request | ||
EPID:L-2019-LRM-0079 | 9 October 2018 | Open | SECY-18-0100: Annual Update Regarding the Integrated Strategy to Modernize the Nuclear Regulatory Commission'S Digital Instrumentation and Control Regulatory Infrastructure | LRM | ||
EPID:L-2019-LRM-0056 | 9 October 2018 | Approved Closed | SECY-18-0100: Annual Update Regarding the Integrated Strategy to Modernize the Nuclear Regulatory Commission'S Digital Instrumentation and Control Regulatory Infrastructure | LRM | ||
EPID:L-2018-LLR-0125 | 12 September 2018 | Open | ASME Code Case N-770-2 | Relief Request | ||
EPID:L-2016-LNE-0001 | 16 August 2018 | Approved Closed | License Renewal | LNE | ||
EPID:L-2020-LLA-0164 | 25 July 2018 | Approved Closed | Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 | License Amendment | ||
EPID:L-2017-LLA-0403 | 29 June 2018 | Withdrawn Closed | License Amendment | |||
EPID:L-2017-LLA-0399 | 8 May 2018 | Approved Closed | License Amendment | |||
EPID:L-2018-LLA-0080 | 4 May 2018 | Approved Closed | Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update | License Amendment | 800 hours33.333 days <br />4.762 weeks <br />1.096 months <br /> | |
EPID:L-2018-LLA-0058 | 19 April 2018 | Approved Closed | Relief Requests Associated with the Fifth Inservice Inspection Interval | License Amendment | 500 hours20.833 days <br />2.976 weeks <br />0.685 months <br /> | |
EPID:L-2018-LLA-0112 | 12 April 2018 | Approved Closed | License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components | License Amendment | 550 hours22.917 days <br />3.274 weeks <br />0.753 months <br /> | |
EPID:L-2018-LRM-0022 | 10 April 2018 | Open | Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides | LRM | ||
EPID:L-2017-FPR-0005 | 23 February 2018 | Open | Package: Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update | FPR | ||
EPID:L-2018-LLR-0025 | 20 February 2018 | Open | Request for NRC Alternative to ASME IWA-5211 Regarding Charging Pipe Visual Inspection, Relief Request W3-ISI-030 | Relief Request | ||
EPID:L-2017-LRM-0068 | 8 February 2018 | Open | License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position (Fuel Assembly Misload) Event | LRM |