Semantic search

Jump to navigation Jump to search
 Start dateStatusTitleTopic
EPID:L-2024-LLR-003429 August 2024Approved
Closed
EPID:L-2023-LLE-004924 January 2024Approved
Closed
EPID:L-2023-LRO-003718 May 2023Approved
Closed
Refuel 32 (O1R32) Steam Generator Tube Inspection Report
EPID:L-2023-LLA-00494 April 2023Withdrawn
Closed
TSTF-52
EPID:L-2023-LLA-002816 February 2023Approved
Closed
TSTF-554
EPID:L-2023-LLR-000323 January 2023Approved
Closed
Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)
EPID:L-2022-LRO-015221 November 2022Approved
Closed
Refuel 31 (O3R31) Steam Generator Tube Inspection Report
EPID:L-2022-LRO-006926 May 2022Approved
Closed
Refuel 30 (O2R30) Steam Generator Tube Inspection Report
EPID:L-2022-LLA-005031 March 2022Approved
Closed
TSTF- 359
EPID:L-2022-LLA-001118 January 2022Approved
Closed
TSTF-541
EPID:L-2021-LLA-023014 December 2021Approved
Closed
SECY-22-0090: Duke Energy Request to Relocate the Emergency Operations Facility
EPID:L-2021-LLA-01572 September 2021Approved
Closed
Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis
EPID:L-2021-SLE-000222 July 2021Approved
Closed
License Renewal
EPID:L-2021-LLA-01119 June 2021Approved
Closed
TSTF-439
EPID:L-2021-SLR-00007 June 2021Approved
Closed
Application for Subsequent Renewed Operating Licenses
EPID:L-2021-LLR-00324 May 2021Approved
Closed
ASME Code Case N-853
EPID:L-2021-LRO-000211 February 2021Approved
Closed
Refuel 31 (O1R31) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval
EPID:L-2021-LLR-000419 January 2021Approved
Closed
Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals
EPID:L-2020-LLE-018018 November 2020Approved
Closed
EPID:L-2020-LLA-00768 May 2020Approved
Closed
TSTF-421
EPID:L-2020-LLA-007513 April 2020Approved
Closed
TSTF-272
EPID:L-2020-LRO-000510 March 2020Approved
Closed
Refuel 29 (O2R29) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval
EPID:L-2019-LLA-018428 August 2019Approved
Closed
Proposed License Amendment Request to Revise the Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of the Containment Building
EPID:L-2019-LRO-000431 July 2019Approved
Closed
EPID:L-2020-LLS-000031 July 2019Approved
Closed
License Amendment Request for Measurement Uncertainty Recapture Power Uprate
EPID:L-2019-LLA-01428 July 2019Approved
Closed
License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description
EPID:L-2018-LLA-03001 November 2018Approved
Closed
License Amendment Request Proposing a Revised Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, ...
EPID:L-2018-LLA-025129 October 2018Approved
Closed
Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Sections Associated with the Oconee Tornado Licensing Basis - License Amendment Request No. 2018-02
EPID:L-2018-LRO-003015 August 2018Approved
Closed
Refuel 29 (03R29) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval
EPID:L-2018-LLA-01745 July 2018Approved
Closed
EPID:L-2018-LLA-014917 May 2018Approved
Closed
License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources
EPID:L-2018-LLA-004212 February 2018Approved
Closed
LAR Physcial Security Plan Fws Endangered Species List
EPID:L-2016-LLR-00014 January 2018Approved
Closed
Responses to Request for Additional Information; Request for Alternative to Codes and Standards Requirements; Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power
EPID:L-2017-JLC-00564 December 2017Approved
Closed
EPID:L-2017-LLA-036529 November 2017Approved
Closed
EPID:L-2017-LLA-03777 November 2017Approved
Closed
TSTF-545
EPID:L-2017-LLA-021911 May 2017Approved
Closed
TSTF-448
CAC:MF955530 March 2017Approved
Closed
CAC:MF937524 February 2017Approved
Closed
CAC:MF803929 August 2016Approved
Closed
CAC:MF837115 August 2016Approved
Closed
CAC:MF815821 July 2016Approved
Closed
CAC:MF816120 July 2016Approved
Closed
CAC:MF66276 June 2016Approved
Closed
CAC:MF765029 April 2016Approved
Closed
CAC:MF613926 April 2016Approved
Closed
CAC:MF741731 March 2016Approved
Closed
CAC:MF736523 March 2016Approved
Closed
CAC:MF64802 February 2016Approved
Closed
CAC:MF641310 November 2015Approved
Closed