EPID:L-2023-LLE-002830 October 2023Approved
Closed
Exemption Request
EPID:L-2023-LLA-007725 May 2023OpenTSTF-580License Amendment
EPID:L-2023-LLR-00253 May 2023OpenRelief Request I4R-14 for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice InspectionRelief Request
EPID:L-2022-LRA-014325 April 2023Approved
Closed
TSTF-306LRA
EPID:L-2023-LLA-01845 April 2023OpenLicense Amendment
EPID:L-2023-LLA-003322 March 2023Approved
Closed
License Amendment
EPID:L-2023-LRM-000921 February 2023OpenLRM
EPID:L-2023-LLA-000812 January 2023OpenApplication to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces AnalysisLicense Amendment
EPID:L-2022-LLR-008330 November 2022OpenConstellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XIRelief Request
EPID:L-2022-LLA-017310 November 2022OpenTSTF-419License Amendment
EPID:L-2022-LLA-01433 October 2022Approved
Closed
TSTF-306License Amendment
EPID:L-2022-LRM-007014 September 2022OpenLRM
EPID:L-2022-LLL-001119 July 2022OpenLLL
EPID:L-2022-LLR-00282 March 2022OpenRelief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B RepairsRelief Request
EPID:L-2022-LLE-000810 February 2022Approved
Closed
Incoming Request-La Salle-Constellation Energy, COVID-19 Related Request for Exemption from Part 26 Work Hours RequirementsExemption Request
EPID:L-2022-LLA-000722 December 2021Approved
Closed
Orano Tli, Submittal of Application for Amendment of LicenseLicense Amendment
EPID:L-2021-LRM-01035 October 2021OpenLRM
EPID:L-2021-LLR-005712 August 2021OpenProposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle RepairsRelief Request
EPID:L-2021-LLA-01213 August 2021Approved
Closed
TSTF-554License Amendment
EPID:L-2021-LRM-006913 July 2021OpenLRM
EPID:L-2021-LLA-016930 June 2021Approved
Closed
TSTF-541License Amendment
EPID:L-2021-LRM-00564 June 2021OpenLRM
EPID:L-2021-LRM-005221 May 2021OpenLRM
EPID:L-2021-LLR-00167 March 2021Approved
Closed
Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve RepairRelief Request
EPID:L-2021-LLR-00563 March 2021OpenASME Code Case OMN-28Relief Request
EPID:L-2021-LLE-00143 March 2021Withdrawn
Closed
Exemption Request
EPID:L-2021-LLE-001120 February 2021Approved
Closed
Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.65Exemption Request
EPID:L-2021-LLA-001610 February 2021Approved
Closed
NRR E-mail Capture - (External_Sender) IEMA Response: State Consultation - LaSalle 1 and 2: License Amendment Request Re; Revision of Technical Specifications to Incorporate GNF CRDA MethodologyLicense Amendment
EPID:L-2021-LLA-00128 February 2021Approved
Closed
License Amendment Request 21-01 Revise Methodology in License Termination PlanLicense Amendment
EPID:L-2020-LRM-011321 January 2021OpenLRM
EPID:L-2021-LLR-00004 January 2021OpenRevised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel PipingRelief Request
EPID:L-2020-LLR-015314 December 2020OpenRelief Request
EPID:L-2020-LLE-01919 December 2020Approved
Closed
Exemption Request
EPID:L-2021-LLR-01531 December 2020OpenProposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining BoltingRelief Request
EPID:L-2020-LLE-02171 December 2020Approved
Closed
Exemption Request
EPID:L-2021-LLE-000424 November 2020Approved
Closed
Incoming Request-La Salle-Exelon Generation Co., LLCExemption Request
EPID:L-2017-FPR-000823 November 2020OpenFPR
EPID:L-2020-LLE-022323 November 2020Approved
Closed
Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, IV.F.2.bExemption Request
EPID:L-2020-LLA-025318 November 2020Approved
Closed
TSTF-582License Amendment
EPID:L-2020-LLR-014716 November 2020OpenASME Code Case N-893Relief Request
EPID:L-2020-LRM-010223 October 2020OpenProposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining BoltingLRM
EPID:L-2020-LLR-011822 September 2020OpenRelief Request
EPID:L-2020-LRM-008916 September 2020OpenPre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55aLRM
EPID:L-2020-LLE-01163 August 2020OpenExemption Request
EPID:L-2021-LLM-000022 June 2020Approved
Closed
Order Extending the Effectiveness of the Approval of the Transfer of the License for the Zion Nuclear Power Station from Zionsolutions, LLC to Exelon Generation Company, LLCLicense Transfer
EPID:L-2020-LRO-00204 June 2020Approved
Closed
LRO
EPID:L-2020-LLA-009630 April 2020Approved
Closed
TSTF-568License Amendment
EPID:L-2020-LLR-006617 April 2020Open(Exelon) Requests an Alternative from Certain Reporting Requirements of ASME Boiler and Pressure Vessel (B&Pv) Code, Section XI, IWA-1400, IWA-6240, and 10 CFR 50.55a(b)(2)(xxxii)Relief Request
EPID:L-2020-LLA-007713 April 2020Approved
Closed
TSTF-566License Amendment
EPID:L-2020-LLE-001125 February 2020Approved
Closed
Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50. 75(h)(1 )(Iv)Exemption Request