Semantic search
Jump to navigation
Jump to search
Name | Start date | End date | |
---|---|---|---|
EPID:L-2023-LRM-0076 | TSTF-505 | 5 October 2023 | 16 October 2023 |
EPID:L-2023-LLE-0022 | 14 September 2023 | 14 September 2023 | |
EPID:L-2023-LLR-0026 | CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components | 17 May 2023 | 26 June 2023 |
EPID:L-2022-LRO-0125 | 21 March 2023 | 21 March 2023 | |
EPID:L-2023-LLR-0010 | 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened | 16 March 2023 | 31 March 2023 |
EPID:L-2023-LLA-0032 | License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications | 1 March 2023 | 31 March 2023 |
EPID:L-2022-LLA-0191 | TSTF-554 | 15 December 2022 | 25 January 2023 |
EPID:L-2022-LLA-0107 | License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements | 2 August 2022 | 27 December 2022 |
EPID:L-2022-LLR-0043 | CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads | 6 April 2022 | 2 June 2022 |
EPID:L-2022-LLR-0039 | Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head . | 4 April 2022 | 10 June 2022 |
EPID:L-2022-LLA-0008 | Removal of the Table of Contents from the Technical Specifications | 12 January 2022 | 16 August 2022 |
EPID:L-2021-LRM-0118 | 29 November 2021 | 11 January 2022 | |
CAC:001027 | 15 November 2021 | 15 November 2021 | |
EPID:L-2021-LRO-0060 | Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage | 1 November 2021 | 5 May 2022 |
EPID:L-2021-LLA-0173 | License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating | 29 September 2021 | 4 November 2022 |
EPID:L-2021-SPR-0005 | 2 September 2021 | 2 September 2021 | |
EPID:L-2020-NFG-0002 | Email-Request for Review and Endorsement of NEI 21-06 Guidelines for 10 CFR 50.59 Implementation at Non-Power Production or Utilization Facilities.Msg | 23 August 2021 | 12 October 2021 |
EPID:L-2021-LLA-0152 | TSTF-567 | 12 August 2021 | 22 October 2021 |
EPID:L-2021-LLA-0089 | 1 July 2021 | 18 May 2022 | |
EPID:L-2021-LRM-0064 | 30 June 2021 | 21 July 2021 | |
EPID:L-2021-LLA-0172 | License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation | 7 June 2021 | 23 February 2022 |
EPID:L-2021-NFO-0003 | 11 May 2021 | 11 May 2021 | |
EPID:L-2020-LLA-0249 | 18 December 2020 | 3 September 2021 | |
EPID:L-2021-LLE-0036 | Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) | 10 November 2020 | 25 August 2021 |
EPID:L-2020-LRM-0104 | 5 November 2020 | 1 December 2020 | |
EPID:L-2020-LLA-0248 | Riv Column 1 EOC 2020 Public Meeting Summary | 4 November 2020 | 2 September 2021 |
EPID:L-2020-LRM-0099 | 23 October 2020 | 30 November 2020 | |
EPID:L-2020-LLR-0134 | Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 1 October 2020 | 30 October 2020 |
EPID:L-2020-LLA-0091 | TSTF-425 | 27 April 2020 | 8 April 2021 |
EPID:L-2020-LLA-0083 | License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 20 April 2020 | 7 December 2020 |
EPID:L-2019-LLR-0077 | ASME Code Case N-666-1 | 25 September 2019 | 27 April 2020 |
EPID:L-2019-LLA-0189 | License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System | 29 August 2019 | 30 September 2019 |
EPID:L-2019-LLR-0075 | ASME Code Case N-513-4 | 15 August 2019 | 12 November 2019 |
EPID:L-2019-LLA-0062 | License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. | 18 March 2019 | 27 February 2020 |
EPID:L-2019-LRO-0013 | Revision 32 to Updated Safety Analysis Report, Chapter 4, Reactor, Public | 11 March 2019 | 9 July 2019 |
EPID:L-2018-LRO-0047 | 27 February 2019 | 27 February 2019 | |
EPID:L-2019-LLA-0036 | License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange | 25 February 2019 | 29 March 2019 |
EPID:L-2019-LLA-0014 | TSTF-529 | 23 January 2019 | 19 August 2019 |
EPID:L-2018-LLR-0101 | ASME Code Case N-666-1 | 23 July 2018 | 12 December 2018 |
EPID:L-2018-LLA-0138 | License Amendment Request for Revision to the Emergency Plan | 9 May 2018 | 1 April 2019 |
EPID:L-2018-LLR-0068 | ASME Code Case N-729-4 | 2 May 2018 | 18 October 2018 |
CAC:MG0233 | 12 March 2018 | 12 March 2018 | |
EPID:L-2017-LLA-0430 | 5 February 2018 | 5 February 2018 | |
EPID:L-2016-LLM-0005 | 8 November 2017 | 8 November 2017 | |
EPID:L-2017-LLM-0001 | 8 November 2017 | 8 November 2017 | |
CAC:MF9406 | 7 November 2017 | 26 September 2018 | |
EPID:L-2018-LLL-0015 | ARV and MSSV Tornado Missile Vulnerabilities Result in Unanalyzed Condition, LER 17-003-00 for Wolf Creek Generating Station Regarding ARV and MSSV Tornado Missile Vulnerabilities Result in Unanalyzed Condition | 2 November 2017 | 3 May 2018 |
CAC:MG0174 | 23 October 2017 | 23 October 2017 | |
CAC:MG0235 | 5 September 2017 | 10 December 2019 | |
CAC:TM3065 | 5 September 2017 | 1 November 2019 |