Name | Start date | End date | |
---|---|---|---|
EPID:L-2023-LLA-0037 | TSTF-505 TSTF-439, TSTF-505 TSTF-425 | 27 February 2023 | 4 April 2023 |
EPID:L-2019-PMP-0067 | Final Accident Sequence Precursor Analysis - River Bend Station, Division '1' Standby Diesel Generator Speed Sensor Power Supply Failure (LER 458-2022-003) - Precursor | 16 February 2023 | 3 March 2023 |
EPID:L-2023-LLL-0004 | Quality Assurance Program Manual Reduction in Commitment | 18 January 2023 | 1 May 2023 |
EPID:L-2022-LLR-0090 | Request to Update ASME Code Relief Request Safety Evaluations with NRC Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) | 6 December 2022 | 26 April 2023 |
EPID:L-2022-LRM-0065 | 31 August 2022 | 7 September 2022 | |
EPID:L-2022-LLR-0054 | ASME Code Case N-752 | 30 June 2022 | 21 July 2022 |
EPID:L-2022-LRM-0043 | ASME Code Case N-752 | 9 June 2022 | 24 June 2022 |
EPID:L-2022-LLA-0080 | TSTF-580 | 26 May 2022 | 28 December 2022 |
EPID:L-2021-LLR-0090 | Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency | 29 November 2021 | 27 September 2022 |
EPID:L-2021-LLA-0183 | TSTF 554 | 6 October 2021 | 12 May 2022 |
EPID:L-2021-LLA-0166 | TSTF-541 | 23 September 2021 | 28 April 2022 |
EPID:L-2021-LLA-0113 | Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials | 15 June 2021 | 19 July 2022 |
EPID:L-2021-LLR-0042 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI | 7 June 2021 | 18 January 2022 |
EPID:L-2021-OLL-0010 | 8 April 2021 | 8 April 2021 | |
EPID:L-2020-LRM-0115 | 19 January 2021 | 9 February 2021 | |
EPID:L-2020-LLR-0160 | Arkansas, Units 1 and 2; Grand Gulf, Unit 1; River Bend, Unit 1; and Waterford, Unit 3, Relief Request Number EN-20-RR-003, Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-711-2, Alternative Examination Cove | 30 December 2020 | 28 October 2021 |
EPID:L-2020-LLE-0212 | 3 December 2020 | 22 December 2020 | |
EPID:L-2020-LLA-0246 | Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program | 2 November 2020 | 2 July 2021 |
EPID:L-2020-LLE-0163 | Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic | 6 October 2020 | 25 November 2020 |
EPID:L-2020-LLA-0205 | TSTF 563 | 18 September 2020 | 8 June 2021 |
EPID:L-2020-LLA-0204 | TSTF-582 | 4 September 2020 | 6 January 2021 |
EPID:L-2020-LLR-0108 | 18 August 2020 | 18 August 2020 | |
EPID:L-2020-LLR-0079 | Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) | 8 June 2020 | 21 September 2021 |
EPID:L-2020-LLA-0110 | TSTF-566 | 13 May 2020 | 1 February 2021 |
EPID:L-2020-LLA-0049 | Withdrawal of an Amendment Request to Extend the Implementation Date for the Emergency Action Level Scheme | 23 March 2020 | 21 May 2020 |
CAC:001648 | 12 March 2020 | 29 April 2020 | |
EPID:L-2020-LLA-0032 | TSTF-501 | 26 February 2020 | 9 March 2021 |
EPID:L-2020-LLA-0010 | TSTF-566 | 24 January 2020 | 24 February 2020 |
EPID:L-2020-LLA-0009 | TSTF 439 | 24 January 2020 | 2 February 2021 |
EPID:L-2019-LRM-0089 | 17 December 2019 | 5 February 2020 | |
EPID:L-2019-LLA-0051 | TSTF-564 | 11 December 2019 | 11 December 2019 |
EPID:L-2019-LLA-0258 | TSTF-425 | 18 November 2019 | 28 September 2020 |
EPID:L-2019-LLR-0009 | ASME Code Case N-831-1 | 31 January 2019 | 19 September 2019 |
EPID:L-2018-LLA-0056 | TSTF-425 | 17 December 2018 | 29 April 2019 |
EPID:L-2018-LLR-0388 | Request for Alternative in Accordance with 10 CFR 50.55a(g)(5)(iii) Proposed Alternative to CFR 50.55a Examination Requirements for Third Interval Volumetric Exams (RBS-ISI-021) | 30 November 2018 | 11 April 2019 |
EPID:L-2018-LLA-0489 | Removal of the Table of Contents from the Technical Specifications | 29 November 2018 | 19 June 2019 |
CAC:MF9423 | 27 August 2018 | 27 August 2018 | |
EPID:L-2018-LLL-0020 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06 ... | 10 May 2018 | 6 June 2018 |
EPID:L-2018-LRM-0022 | Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides | 10 April 2018 | 27 April 2018 |
EPID:L-2018-LLA-0083 | License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves | 2 April 2018 | 17 January 2019 |
EPID:L-2018-LLR-0008 | 9 March 2018 | 16 November 2018 | |
EPID:L-2018-LLR-0009 | ASME Code Case N-702 | 9 March 2018 | 9 March 2018 |
EPID:L-2018-LLR-0042 | Request for Alternative in Accordance with 10 CFR 50.55a (g)(5)(iii) Proposed Alternative to 10 CFR 50.55a Examination Requirements for Pressure Retaining Welds in Control Rod Housings (RR-RBS-ISI-016) | 5 March 2018 | 7 November 2018 |
EPID:L-2017-FPR-0005 | Package: Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update | 23 February 2018 | 23 November 2020 |
EPID:L-2018-LLA-0029 | Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling | 29 January 2018 | 21 December 2018 |
EPID:L-2017-LRO-0058 | 22 January 2018 | 22 January 2018 | |
TAC:MF9757 | 12 December 2017 | 19 October 2018 | |
EPID:L-2017-LLR-0141 | ASME Code Case N-513-4 | 17 November 2017 | 8 June 2018 |
EPID:L-2017-LLA-0383 | TSTF-542 | 15 November 2017 | 7 November 2018 |
EPID:L-2017-LNE-0027 | License Renewal | 19 September 2017 | 14 November 2018 |