Name | Start date | End date | |
---|---|---|---|
EPID:L-2023-LRM-0103 | 13 December 2023 | 13 December 2023 | |
EPID:L-2023-LLA-0064 | Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) | 4 May 2023 | 1 June 2023 |
EPID:L-2023-LLA-0039 | Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu | 20 March 2023 | 25 May 2023 |
EPID:L-2023-LLA-0029 | Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) | 27 February 2023 | 7 June 2023 |
EPID:L-2023-LRM-0010 | 13 February 2023 | 16 March 2023 | |
EPID:L-2022-LRM-0098 | 11 January 2023 | 9 March 2023 | |
EPID:L-2022-LLR-0082 | American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 | 28 November 2022 | 15 December 2022 |
EPID:L-2021-LLA-0224 | TSTF-563 | 4 November 2022 | 4 November 2022 |
EPID:L-2022-LRM-0092 | Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 | 3 November 2022 | 5 December 2022 |
EPID:L-2022-LLA-0103 | Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) | 27 July 2022 | 5 April 2023 |
EPID:L-2022-LLA-0100 | TSTF-554 | 13 July 2022 | 3 March 2023 |
EPID:L-2022-LLQ-0003 | 17 June 2022 | 17 June 2022 | |
EPID:L-2022-LLA-0088 | TSTF-529 | 13 June 2022 | 20 January 2023 |
EPID:L-2022-LRM-0040 | 19 May 2022 | 27 June 2022 | |
EPID:L-2022-LLR-0045 | 16 May 2022 | 8 March 2023 | |
EPID:L-2022-LLR-0048 | American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternatives RP-11 (SQN) and IST-RR-9 (WBN) | 26 April 2022 | 12 October 2022 |
EPID:L-2022-LLE-0017 | 25 April 2022 | 29 April 2022 | |
EPID:L-2022-LRM-0032 | 8 April 2022 | 20 April 2022 | |
EPID:L-2022-LRM-0026 | Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants | 31 March 2022 | 20 April 2022 |
EPID:L-2021-LRO-0071 | Order of the Secretary (Extending Time for Commission Review) | 2 March 2022 | 28 March 2022 |
EPID:L-2022-LLA-0026 | TSTF-493 | 17 February 2022 | 20 September 2022 |
EPID:L-2022-LLA-0021 | Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change | 27 January 2022 | 7 December 2022 |
EPID:L-2022-LLL-0000 | Revision to Watts Bar Nuclear Plant, Unit 2, Reactor Vessel Surveillance Capsule Withdrawal Schedule | 24 January 2022 | 14 November 2022 |
EPID:L-2021-LRM-0116 | Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal | 1 December 2021 | 4 January 2022 |
EPID:L-2021-NFO-0011 | 3 November 2021 | 3 November 2021 | |
EPID:L-2021-LLA-0174 | Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019) | 29 September 2021 | 20 September 2022 |
EPID:L-2021-LRM-0096 | 21 September 2021 | 3 November 2021 | |
EPID:L-2020-LLA-0195 | 17 September 2021 | 17 September 2021 | |
EPID:L-2022-LLQ-0002 | Bellefonte Nuclear Plant, Units 1 and 2, Status Update and Request for Extension of Construction Permits (CPPR-122 and CPPR-123) | 31 August 2021 | 5 April 2022 |
EPID:L-2021-LRM-0067 | Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 | 6 August 2021 | 15 September 2021 |
EPID:L-2021-LRM-0074 | Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2 | 5 August 2021 | 15 September 2021 |
EPID:L-2022-LRM-0008 | Relief Request 67 - Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection | 29 July 2021 | 14 February 2022 |
EPID:L-2021-LLA-0100 | 29 June 2021 | 4 May 2022 | |
EPID:L-2020-LLA-0167 | 17 June 2021 | 17 June 2021 | |
EPID:L-2021-LRM-0055 | 25 May 2021 | 30 June 2021 | |
EPID:L-2022-LRM-0000 | TVA Slides - Watts Bar Nuclear Plant (WBN) Schedule for the Development of a License Amendment Request (LAR) for Increased Tritium Production at WBN | 11 May 2021 | 9 February 2022 |
EPID:L-2021-LRO-0023 | Tennessee Valley Authority - Emergency Preparedness Department Procedure Revisions | 10 May 2021 | 11 May 2022 |
EPID:L-2021-LRM-0042 | 27 April 2021 | 4 May 2021 | |
EPID:L-2016-FPR-0001 | 12 April 2021 | 12 April 2021 | |
EPID:L-2021-LRM-0038 | Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves | 6 April 2021 | 13 April 2021 |
EPID:L-2021-LLA-0043 | TSTF-510 | 11 March 2021 | 25 January 2022 |
EPID:L-2021-LLA-0035 | Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as N | 3 March 2021 | 18 January 2022 |
EPID:L-2021-LLA-0030 | License Amendment Request to Revise Updated Final Safety Analysis Report Section 15.5.5 - Steam Generator Tube Rupture Dose Analysis (WBN-TS-20-04) | 2 March 2021 | 12 January 2022 |
EPID:L-2021-LLA-0032 | TSTF-510, TSTF-205, TSTF-448 TSTF-425 | 17 February 2021 | 22 November 2021 |
EPID:L-2021-LRO-0003 | Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) | 11 February 2021 | 5 January 2022 |
EPID:L-2021-LRM-0012 | 1 February 2021 | 3 March 2021 | |
EPID:L-2020-LLA-0270 | 21 January 2021 | 16 December 2021 | |
EPID:L-2021-LRM-0002 | 19 January 2021 | 23 February 2021 | |
EPID:L-2020-NFO-0004 | 11 January 2021 | 11 January 2021 | |
EPID:L-2020-LLA-0273 | Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024) | 23 December 2020 | 23 February 2021 |