Semantic search

Jump to navigation Jump to search
 NameStart dateEnd date
EPID:L-2023-LLR-0024Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 14 May 202324 May 2023
EPID:L-2023-LRO-002824 April 202324 April 2023
EPID:L-2023-OLL-002114 April 202314 April 2023
EPID:L-2023-LLA-0049TSTF-524 April 20233 May 2023
EPID:L-2022-LRO-01516 March 20236 March 2023
EPID:L-2023-LLR-0020Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)17 February 202330 May 2023
EPID:L-2023-LLA-0028TSTF-55416 February 202329 August 2023
EPID:L-2023-LLA-0021TSTF 50516 February 202318 April 2023
EPID:L-2023-LLR-0018Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2 February 20231 May 2023
EPID:L-2023-LLA-0015TSTF-493
TSTF-425
TSTF-545
1 February 202320 June 2023
EPID:L-2023-LLR-0003Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)23 January 202326 July 2023
EPID:L-2022-LRM-0084TSTF-50530 November 20228 December 2022
EPID:L-2022-NFO-001022 November 202222 November 2022
EPID:L-2022-LRO-0152Refuel 31 (O3R31) Steam Generator Tube Inspection Report21 November 202225 May 2023
EPID:L-2022-LRO-0069Refuel 30 (O2R30) Steam Generator Tube Inspection Report26 May 202229 November 2022
EPID:L-2022-LLR-0060Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems.19 May 202226 September 2023
EPID:L-2022-LLE-001516 May 202216 May 2022
EPID:L-2022-LRM-0031TSTF-425
TSTF-545
20 April 202210 May 2022
EPID:L-2022-LLA-0050TSTF- 35931 March 20228 December 2022
EPID:L-2022-LLA-0036TSTF 56924 March 202212 September 2022
EPID:L-2022-LRO-0141End of Cycle 27 (M2R27) Steam Generator Tube Inspection Report24 March 20221 May 2023
EPID:L-2022-OLL-0012301 Post Exam Comments11 March 202225 March 2022
EPID:L-2022-LLA-0011TSTF-54118 January 202214 November 2022
EPID:L-2021-LLA-0230SECY-22-0090: Duke Energy Request to Relocate the Emergency Operations Facility14 December 202110 March 2023
EPID:L-2021-LRM-011229 November 202129 December 2021
EPID:L-2021-LLA-0198Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Revisions 1, 2, and 325 October 202119 July 2022
EPID:L-2021-LLR-002820 September 202120 September 2021
EPID:L-2021-LLA-0161TSTF-57716 September 20214 March 2022
EPID:L-2021-LLA-0157Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis2 September 202115 July 2022
EPID:L-2020-LLQ-000627 August 20215 October 2021
EPID:L-2021-LLA-023220 August 202129 November 2022
EPID:L-2021-LLR-0052ASME Code Case OMN-2219 August 202118 February 2022
EPID:L-2021-LLR-005519 August 202123 February 2022
EPID:L-2021-LLR-0053ASME Code Case OMN-2619 August 202120 December 2021
EPID:L-2021-LLR-005119 August 202119 August 2021
EPID:L-2021-LRM-0078License Amendment Request for Revision 1 of DPC-NE-1007-P, Conditional Exemption of the End-of-Cycle (EOC) Moderator Temperature Coefficient (Mtc) Measurement Methodology3 August 202122 September 2021
EPID:L-2021-LRO-0043Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report2 August 202118 January 2022
EPID:L-2021-LLR-0054ASME Code Case OMN-2829 July 202115 March 2022
EPID:L-2021-LLR-0048Request to Use Provisions of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv)1 July 202116 November 2021
EPID:L-2021-LLA-0111TSTF-4399 June 202114 June 2022
EPID:L-2021-LLR-0043ASME Code Case N-8858 June 202111 January 2022
EPID:L-2021-SLR-0000Application for Subsequent Renewed Operating Licenses7 June 202119 December 2022
EPID:L-2021-LLR-0034Proposed Alternative for Inservice Inspection of Containment Post-Tensioning System Components6 May 20217 December 2021
EPID:L-2021-LLR-0032ASME Code Case N-8534 May 20217 February 2022
EPID:L-2022-LLR-0010SLC Manual Revision to Loes and 16.11-224 April 202131 August 2022
EPID:L-2021-LRM-0110December 7, 2021, Pre-submittal Presentation Regarding Embedded Flaw Repair Relief Request23 April 202114 December 2021
EPID:L-2021-NFO-000416 March 202126 May 2021
EPID:L-2021-LRM-0033ASME Code Case N-85316 March 202127 April 2021
EPID:L-2021-LRO-0002Refuel 31 (O1R31) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval11 February 202126 August 2021
EPID:L-2020-LLA-01981, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan4 February 202126 August 2021