Name | Start date | End date | |
---|---|---|---|
EPID:L-2023-LRM-0103 | 13 December 2023 | 13 December 2023 | |
EPID:L-2023-LLA-0035 | 8 September 2023 | 8 September 2023 | |
EPID:L-2023-LLR-0024 | Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 | 4 May 2023 | 24 May 2023 |
EPID:L-2023-LLA-0049 | TSTF-52 | 4 April 2023 | 3 May 2023 |
EPID:L-2023-LLR-0020 | Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 17 February 2023 | 30 May 2023 |
EPID:L-2023-LLA-0028 | TSTF-554 | 16 February 2023 | 29 August 2023 |
EPID:L-2023-LLR-0018 | Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | 2 February 2023 | 1 May 2023 |
EPID:L-2023-LLA-0015 | TSTF-493 TSTF-425 TSTF-545 | 1 February 2023 | 20 June 2023 |
EPID:L-2023-LLA-0012 | TSTF-541 | 31 January 2023 | 21 February 2023 |
EPID:L-2023-LLR-0003 | Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 23 January 2023 | 26 July 2023 |
EPID:L-2023-LRM-0003 | 18 January 2023 | 18 January 2023 | |
EPID:L-2023-LLA-0004 | Certificate of Compliance No. 9380, Revision No. 2, for the Model No. Traveller Package | 10 January 2023 | 26 April 2023 |
EPID:L-2022-LLA-0192 | TSTF-478 | 20 December 2022 | 23 May 2023 |
EPID:L-2022-LLR-0086 | Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval | 12 December 2022 | 1 June 2023 |
EPID:L-2022-NFO-0010 | 22 November 2022 | 22 November 2022 | |
EPID:L-2022-LRO-0152 | Refuel 31 (O3R31) Steam Generator Tube Inspection Report | 21 November 2022 | 25 May 2023 |
EPID:L-2022-RNW-0019 | 17 November 2022 | 17 November 2022 | |
EPID:L-2022-LRM-0077 | October 13, 2022 Public Meeting on 5th Interval Alternative Planned Requests - Licensee Slides | 13 October 2022 | 2 December 2022 |
EPID:L-2022-LLA-0144 | Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543) | 29 September 2022 | 16 May 2023 |
EPID:L-2022-LRM-0073 | Meeting with Tennessee Valley Authority to Discuss Proposed Alternative Request for Browns Ferry Nuclear Plant | 21 September 2022 | 28 September 2022 |
EPID:L-2022-LLR-0062 | American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 | 22 August 2022 | 11 March 2023 |
EPID:L-2022-LLQ-0003 | 17 June 2022 | 17 June 2022 | |
EPID:L-2022-LLA-0088 | TSTF-529 | 13 June 2022 | 20 January 2023 |
EPID:L-2022-LRO-0069 | Refuel 30 (O2R30) Steam Generator Tube Inspection Report | 26 May 2022 | 29 November 2022 |
EPID:L-2022-LLR-0049 | Request for Relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, in Accordance with 10 CFR 50.55a(g)(5)(iii) and 50.55a(g)(6) (BFN-2-ISI-003) | 24 May 2022 | 13 March 2023 |
EPID:L-2022-LLR-0060 | Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems. | 19 May 2022 | 26 September 2023 |
EPID:L-2022-LLR-0045 | 16 May 2022 | 8 March 2023 | |
EPID:L-2022-LRM-0031 | TSTF-425 TSTF-545 | 20 April 2022 | 10 May 2022 |
EPID:L-2022-LLA-0050 | TSTF- 359 | 31 March 2022 | 8 December 2022 |
EPID:L-2022-LLA-0049 | TSTF-505 | 21 March 2022 | 2 May 2023 |
EPID:L-2022-LLA-0021 | Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change | 27 January 2022 | 7 December 2022 |
EPID:L-2022-LLA-0011 | TSTF-541 | 18 January 2022 | 14 November 2022 |
EPID:L-2022-LLR-0000 | Request to Use a Portion of Later Edition of the ASME Operation and Maintenance of Nuclear Power Plants | 6 January 2022 | 12 January 2022 |
EPID:L-2021-LLA-0230 | SECY-22-0090: Duke Energy Request to Relocate the Emergency Operations Facility | 14 December 2021 | 10 March 2023 |
EPID:L-2021-LLA-0217 | TSTF-205 TSTF-563 | 3 December 2021 | 1 December 2022 |
EPID:L-2021-LRM-0112 | 29 November 2021 | 29 December 2021 | |
EPID:L-2021-LLA-0212 | TSTF-568 | 19 November 2021 | 16 March 2022 |
EPID:L-2021-LLA-0203 | 5 November 2021 | 22 November 2022 | |
EPID:L-2021-LRO-0054 | Submittal of Browns Ferry Unit 2 Reactor Pressure Vessel Vertical Weld Flaw Evaluation | 4 October 2021 | 22 February 2022 |
EPID:L-2021-LRM-0091 | ASME Code Case N-526 | 27 September 2021 | 12 October 2021 |
EPID:L-2021-LRM-0096 | 21 September 2021 | 3 November 2021 | |
EPID:L-2021-LRM-0092 | TSTF-563 | 9 September 2021 | 20 October 2021 |
EPID:L-2021-LLA-0157 | Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis | 2 September 2021 | 15 July 2022 |
EPID:L-2022-LLQ-0002 | Bellefonte Nuclear Plant, Units 1 and 2, Status Update and Request for Extension of Construction Permits (CPPR-122 and CPPR-123) | 31 August 2021 | 5 April 2022 |
EPID:L-2021-LRM-0090 | 30 August 2021 | 14 September 2021 | |
EPID:L-2021-LLR-0052 | ASME Code Case OMN-22 | 19 August 2021 | 18 February 2022 |
EPID:L-2021-LLR-0051 | 19 August 2021 | 19 August 2021 | |
EPID:L-2021-LLR-0055 | 19 August 2021 | 23 February 2022 | |
EPID:L-2021-LLR-0053 | ASME Code Case OMN-26 | 19 August 2021 | 20 December 2021 |
EPID:L-2021-LLR-0054 | ASME Code Case OMN-28 | 29 July 2021 | 15 March 2022 |