Semantic search
Jump to navigation
Jump to search
Name | Start date | End date | |
---|---|---|---|
EPID:L-2023-LLR-0031 | 27 July 2023 | 27 July 2023 | |
EPID:L-2023-LRM-0045 | 14 July 2023 | 14 July 2023 | |
EPID:L-2023-LRM-0038 | 8 June 2023 | 8 June 2023 | |
EPID:L-2023-LRM-0014 | Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy | 12 April 2023 | 15 May 2023 |
EPID:L-2023-LLE-0008 | Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities | 29 March 2023 | 5 October 2023 |
EPID:L-2023-LLE-0007 | Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E | 29 March 2023 | 5 May 2023 |
EPID:L-2023-LLR-0007 | CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) | 3 March 2023 | 18 May 2023 |
EPID:L-2023-LLR-0005 | 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) | 7 February 2023 | 11 April 2023 |
EPID:L-2023-LLR-0002 | CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program | 23 January 2023 | 16 May 2023 |
EPID:L-2023-LLL-0004 | Quality Assurance Program Manual Reduction in Commitment | 18 January 2023 | 1 May 2023 |
EPID:L-2023-SLE-0000 | Application for Subsequent License Renewal Appendix E - Applicants Environmental Report | 9 January 2023 | 9 August 2023 |
EPID:L-2022-LLR-0088 | L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative | 15 December 2022 | 25 April 2023 |
EPID:L-2022-LLE-0031 | Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance | 26 October 2022 | 28 December 2023 |
EPID:L-2022-LRO-0138 | TSTF-577 | 13 October 2022 | 24 January 2023 |
EPID:L-2022-LLA-0146 | Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 4 October 2022 | 22 June 2023 |
EPID:L-2022-LLA-0139 | License Amendment Request 295, Beacon Power Distribution Monitoring System | 26 September 2022 | 18 October 2022 |
EPID:L-2022-LLA-0136 | Cyber Security Plan | 14 September 2022 | 7 October 2022 |
EPID:L-2022-LRO-0073 | Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 | 22 August 2022 | 2 May 2023 |
EPID:L-2022-LLE-0024 | 12 August 2022 | 12 August 2022 | |
EPID:L-2022-LLA-0099 | License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme | 12 July 2022 | 31 October 2022 |
EPID:L-2022-LLE-0032 | Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel | 13 June 2022 | 9 December 2022 |
EPID:L-2022-LLA-0074 | TSTF-505 | 20 May 2022 | 1 June 2023 |
EPID:L-2022-LRO-0058 | TSTF-577 | 27 April 2022 | 27 October 2022 |
EPID:L-2022-LLA-0044 | TSTF-366 | 4 April 2022 | 4 April 2022 |
EPID:L-2022-LLR-0031 | 30 March 2022 | 30 September 2022 | |
EPID:L-2002-LLA-0044 | License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process | 25 March 2022 | 12 September 2022 |
EPID:L-2022-LLA-0041 | License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency | 18 March 2022 | 31 October 2022 |
EPID:L-2022-LLR-0021 | ASME Code Case OMN-26 | 16 March 2022 | 16 March 2022 |
EPID:L-2022-LLR-0030 | TSTF-425 | 7 March 2022 | 16 November 2022 |
EPID:L-2022-LLA-0184 | Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) | 7 March 2022 | 26 January 2023 |
EPID:L-2022-LRM-0011 | 18 February 2022 | 18 February 2022 | |
EPID:L-2022-RNW-0000 | License Renewal | 14 February 2022 | 14 February 2022 |
EPID:L-2022-LLR-0012 | L-PI-22-004 Prairie Island Nuclear Generating Plant, Unit 2, 10 CFR 50.55a Request No. RR-08, Request for Alternative to ISTC 3630(f) | 8 February 2022 | 30 September 2022 |
EPID:L-2022-LRM-0015 | Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company | 1 February 2022 | 14 September 2022 |
EPID:L-2022-LRM-0002 | 24 January 2022 | 24 January 2022 | |
EPID:L-2022-LLA-0084 | TSTF-577 | 17 January 2022 | 1 November 2022 |
EPID:L-2022-LRO-0010 | 13 January 2022 | 4 May 2022 | |
EPID:L-2021-LLA-0231 | License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank | 13 December 2021 | 27 December 2022 |
EPID:L-2022-LLA-0106 | TSTF-567 | 9 December 2021 | 4 May 2023 |
EPID:L-2021-LLE-0050 | Issuance of One-Time Exemption for a Failed Fuel Can in Exceeding Technical Specifications Weight Limit Pertaining to CoC, 1004 Renewed Amendment 17, 61BTH Type 2 Dry Shielded Canister, for Duane Arnold Energy Center ISFSI | 2 December 2021 | 11 February 2022 |
EPID:L-2021-LLA-0210 | License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant | 15 November 2021 | 3 August 2022 |
EPID:L-2021-LLR-0083 | Clone of 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing (IST) Ten-Year Interval PR-02 (L-MT-21-054) | 1 November 2021 | 7 June 2022 |
EPID:L-2021-LLA-0180 | 29 October 2021 | 17 August 2022 | |
EPID:L-2021-LLR-0081 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-02 (LMT-21-049) | 5 October 2021 | 2 May 2022 |
EPID:L-2021-LRM-0098 | 22 September 2021 | 15 October 2021 | |
EPID:L-2021-LRM-0086 | TSTF-505 | 13 September 2021 | 26 October 2021 |
EPID:L-2021-LLR-0062 | 13 September 2021 | 21 June 2022 | |
EPID:L-2021-LLR-0063 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041) | 31 August 2021 | 21 January 2022 |
EPID:L-2021-LLR-0061 | 10CFR50.55a Request Associated with the Sixth Inservice Testing Ten-Year Interval (L-MT-21-039) | 25 August 2021 | 12 May 2022 |
EPID:L-2021-LLR-0060 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval PR-04 (L-MT-21-013) | 25 August 2021 | 11 May 2022 |