Semantic search

Jump to navigation Jump to search
 NameStart dateEnd date
EPID:L-2023-LLR-003127 July 202327 July 2023
EPID:L-2023-LRM-004514 July 202314 July 2023
EPID:L-2023-LRM-00388 June 20238 June 2023
EPID:L-2023-LRM-0014Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy12 April 202315 May 2023
EPID:L-2023-LLE-0008Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities29 March 20235 October 2023
EPID:L-2023-LLE-0007Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E29 March 20235 May 2023
EPID:L-2023-LLR-0007CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)3 March 202318 May 2023
EPID:L-2023-LLR-000510CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)7 February 202311 April 2023
EPID:L-2023-LLR-0002CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program23 January 202316 May 2023
EPID:L-2023-LLL-0004Quality Assurance Program Manual Reduction in Commitment18 January 20231 May 2023
EPID:L-2023-SLE-0000Application for Subsequent License Renewal Appendix E - Applicants Environmental Report9 January 20239 August 2023
EPID:L-2022-LLR-0088L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative15 December 202225 April 2023
EPID:L-2022-LLE-0031Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance26 October 202228 December 2023
EPID:L-2022-LRO-0138TSTF-57713 October 202224 January 2023
EPID:L-2022-LLA-0146Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 24 October 202222 June 2023
EPID:L-2022-LLA-0139License Amendment Request 295, Beacon Power Distribution Monitoring System26 September 202218 October 2022
EPID:L-2022-LLA-0136Cyber Security Plan14 September 20227 October 2022
EPID:L-2022-LRO-0073Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 202222 August 20222 May 2023
EPID:L-2022-LLE-002412 August 202212 August 2022
EPID:L-2022-LLA-0099License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme12 July 202231 October 2022
EPID:L-2022-LLE-0032Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel13 June 20229 December 2022
EPID:L-2022-LLA-0074TSTF-50520 May 20221 June 2023
EPID:L-2022-LRO-0058TSTF-57727 April 202227 October 2022
EPID:L-2022-LLA-0044TSTF-3664 April 20224 April 2022
EPID:L-2022-LLR-003130 March 202230 September 2022
EPID:L-2002-LLA-0044License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process25 March 202212 September 2022
EPID:L-2022-LLA-0041License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency18 March 202231 October 2022
EPID:L-2022-LLR-0021ASME Code Case OMN-2616 March 202216 March 2022
EPID:L-2022-LLR-0030TSTF-4257 March 202216 November 2022
EPID:L-2022-LLA-0184Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)7 March 202226 January 2023
EPID:L-2022-LRM-001118 February 202218 February 2022
EPID:L-2022-RNW-0000License Renewal14 February 202214 February 2022
EPID:L-2022-LLR-0012L-PI-22-004 Prairie Island Nuclear Generating Plant, Unit 2, 10 CFR 50.55a Request No. RR-08, Request for Alternative to ISTC 3630(f)8 February 202230 September 2022
EPID:L-2022-LRM-0015Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company1 February 202214 September 2022
EPID:L-2022-LRM-000224 January 202224 January 2022
EPID:L-2022-LLA-0084TSTF-57717 January 20221 November 2022
EPID:L-2022-LRO-001013 January 20224 May 2022
EPID:L-2021-LLA-0231License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank13 December 202127 December 2022
EPID:L-2022-LLA-0106TSTF-5679 December 20214 May 2023
EPID:L-2021-LLE-0050Issuance of One-Time Exemption for a Failed Fuel Can in Exceeding Technical Specifications Weight Limit Pertaining to CoC, 1004 Renewed Amendment 17, 61BTH Type 2 Dry Shielded Canister, for Duane Arnold Energy Center ISFSI2 December 202111 February 2022
EPID:L-2021-LLA-0210License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant15 November 20213 August 2022
EPID:L-2021-LLR-0083Clone of 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing (IST) Ten-Year Interval PR-02 (L-MT-21-054)1 November 20217 June 2022
EPID:L-2021-LLA-018029 October 202117 August 2022
EPID:L-2021-LLR-008110 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-02 (LMT-21-049)5 October 20212 May 2022
EPID:L-2021-LRM-009822 September 202115 October 2021
EPID:L-2021-LRM-0086TSTF-50513 September 202126 October 2021
EPID:L-2021-LLR-006213 September 202121 June 2022
EPID:L-2021-LLR-006310 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041)31 August 202121 January 2022
EPID:L-2021-LLR-006110CFR50.55a Request Associated with the Sixth Inservice Testing Ten-Year Interval (L-MT-21-039)25 August 202112 May 2022
EPID:L-2021-LLR-006010 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval PR-04 (L-MT-21-013)25 August 202111 May 2022