Semantic search
Jump to navigation
Jump to search
Name | Start date | End date | |
---|---|---|---|
EPID:L-2023-LLA-0074 | 23 May 2023 | 21 June 2023 | |
EPID:L-2022-LLA-0164 | 5 May 2023 | 5 May 2023 | |
EPID:L-2023-LLA-0065 | License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits and Exemption Request for Use of M5 Cladding | 2 May 2023 | 25 May 2023 |
EPID:L-2023-LLE-0013 | License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits and Exemption Request for Use of M5 Cladding | 2 May 2023 | 31 August 2023 |
EPID:L-2023-LLE-0007 | Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E | 29 March 2023 | 5 May 2023 |
EPID:L-2023-LLE-0008 | Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities | 29 March 2023 | 5 October 2023 |
EPID:L-2023-OLL-0036 | 22 February 2023 | 22 February 2023 | |
EPID:L-2023-LLA-0006 | Proposed Emergency Plan Revision, Relocation of the Technical Support Center | 13 January 2023 | 8 February 2023 |
EPID:L-2023-LLA-0009 | Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure Temperature Limitation Figures | 13 January 2023 | 7 February 2023 |
EPID:L-2022-LLA-0196 | 28 December 2022 | 24 January 2023 | |
EPID:L-2022-LLT-0003 | Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code | 19 December 2022 | 20 June 2023 |
EPID:L-2022-NFO-0005 | 5 December 2022 | 5 December 2022 | |
EPID:L-2022-OLL-0007 | 2 December 2022 | 2 December 2022 | |
EPID:L-2022-LLA-0167 | Proposed Emergency Plan Revision - Relocation of the Technical Support Center | 18 November 2022 | 10 May 2023 |
EPID:L-2022-LLR-0081 | Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles | 17 November 2022 | 21 April 2023 |
EPID:L-2022-LLA-0166 | Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times | 7 November 2022 | 31 August 2023 |
EPID:L-2022-LLA-0162 | Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump | 3 November 2022 | 15 March 2023 |
EPID:L-2022-LRO-0142 | End of Cycle 21 Steam Generator Tube Inspection Report | 27 October 2022 | 12 June 2023 |
EPID:L-2022-LRM-0076 | 18 October 2022 | 16 November 2022 | |
EPID:L-2022-LLR-0067 | Alternative Request IR-4-11, Proposed Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces | 28 September 2022 | 25 October 2022 |
EPID:L-2022-LLR-0064 | Proposed Request for Alternative Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps | 15 September 2022 | 19 October 2022 |
EPID:L-2019-PMP-0039 | TSTF-490 | 15 September 2022 | 27 December 2022 |
EPID:L-2022-LRO-0077 | 9 September 2022 | 9 September 2022 | |
EPID:L-2022-LRM-0059 | 7 September 2022 | 5 October 2022 | |
EPID:L-2022-LRM-0058 | 29 August 2022 | 29 September 2022 | |
EPID:L-2022-LLA-0118 | License Amendment Request - Proposed Technical Specifications Change for New Fuel and Spent Fuel Storage Areas | 15 August 2022 | 16 November 2022 |
EPID:L-2022-LRM-0057 | 9 August 2022 | 9 August 2022 | |
EPID:L-2022-LLD-0006 | 27 July 2022 | 27 July 2022 | |
EPID:L-2022-LLA-0091 | 11 July 2022 | 11 July 2022 | |
EPID:L-2022-LLA-0089 | TSTF-448 | 20 June 2022 | 10 March 2023 |
EPID:L-2022-LLA-0078 | TSTF-554 | 25 May 2022 | 16 June 2023 |
EPID:L-2022-NFO-0004 | 12 May 2022 | 12 May 2022 | |
EPID:L-2022-LLA-0069 | TSTF-547 TSTF-54 | 11 May 2022 | 9 May 2023 |
EPID:L-2022-LLA-0068 | License Amendment Request for Application of Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure | 11 May 2022 | 20 March 2023 |
EPID:L-2022-LLA-0052 | TSTF-359 | 3 May 2022 | 24 April 2023 |
EPID:L-2022-LRO-0049 | Steam Generator Tube Inspection Report for the Fall 2021 Refueling Outage | 14 April 2022 | 1 November 2022 |
EPID:L-2022-LLA-0056 | License Amendment Request for NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure | 14 April 2022 | 25 April 2023 |
EPID:L-2202-LRM-0028 | 29 March 2022 | 17 May 2022 | |
EPID:L-2022-LLR-0084 | American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 | 15 March 2022 | 25 April 2023 |
EPID:L-2022-LRM-0014 | 11 February 2022 | 15 March 2022 | |
EPID:L-2020-LLD-0000 | EA-22-008 | 27 January 2022 | 3 February 2022 |
EPID:L-2021-LLR-0088 | ASME Section XI Inservice Inspection Program Relief Request N2-14-LMT-003 Fourth Interval Third Period Limited Examinations | 13 December 2021 | 28 July 2022 |
EPID:L-2021-LLR-0087 | Alternative Request IR-4-09 for Use of an Alternative Brazed Joint Assessment Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping | 17 November 2021 | 28 July 2022 |
EPID:L-2021-LLR-0086 | ASME Code Case OMN-28 | 16 November 2021 | 8 March 2022 |
EPID:L-2021-LLA-0186 | TSTF-569 | 2 November 2021 | 17 January 2023 |
EPID:L-2021-LLA-0158 | TSTF-577 | 9 September 2021 | 22 March 2022 |
EPID:L-2021-LRO-0046 | Steam Generating Tube Inspection Report for the Spring 2021 Refueling Outage | 27 August 2021 | 9 March 2022 |
EPID:L-2021-LRM-0063 | 19 July 2021 | 19 July 2021 | |
EPID:L-2021-LLA-0082 | Proposed License Amendment Request - Revise Primary Grade Water Isolation Time from 15 Minutes to 1 Hour Following Reactor Shutdown | 6 May 2021 | 7 July 2021 |
EPID:L-2021-LRO-0006 | 27 April 2021 | 27 April 2021 |