Name | Start date | End date | |
---|---|---|---|
EPID:L-2023-LRM-0064 | 19 September 2023 | 19 September 2023 | |
EPID:L-2023-OLL-0008 | 14 June 2023 | 14 June 2023 | |
EPID:L-2023-LLA-0091 | TSTF-59 | 13 June 2023 | 30 June 2023 |
EPID:L-2023-LLA-0076 | Emergency License Amendment Request - One-Time Extension of the Control Room Emergency Ventilation System (CREVS) Technical Specification | 2 June 2023 | 12 June 2023 |
EPID:L-2023-LLA-0077 | TSTF-580 | 25 May 2023 | 21 September 2023 |
EPID:L-2022-LRA-0143 | TSTF-306 | 25 April 2023 | 25 April 2023 |
EPID:L-2023-LLR-0012 | ASME Code Case N-716-3 | 29 March 2023 | 5 April 2023 |
EPID:L-2023-LLR-0017 | Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative | 27 March 2023 | 14 April 2023 |
EPID:L-2023-LLR-0011 | Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 24 March 2023 | 31 March 2023 |
EPID:L-2022-LLA-0043 | TSTF-246 | 1 March 2023 | 1 March 2023 |
EPID:L-2023-LLR-0006 | Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping | 24 February 2023 | 20 June 2023 |
EPID:L-2022-LLA-0031 | TSTF-315 | 22 February 2023 | 22 February 2023 |
EPID:L-2023-LRM-0009 | 21 February 2023 | 24 March 2023 | |
EPID:L-2023-LLA-0023 | License Amendment Request to Modify the Long-Term Coupon Surveillance Program | 21 February 2023 | 6 June 2023 |
EPID:L-2023-LRO-0008 | Long Island Power Authority and Long Island Lighting Company Request for Threshold Determination Regarding Nine Mile Point Nuclear Station, Unit No. 2 | 15 February 2023 | 20 April 2023 |
EPID:L-2022-LLR-0044 | 1 February 2023 | 1 February 2023 | |
EPID:L-2022-LLA-0198 | 26 January 2023 | 24 April 2023 | |
EPID:L-2022-LLA-0185 | TSTF-505 | 15 December 2022 | 29 May 2023 |
EPID:L-2022-LLA-0186 | TSTF-505 TSTF-3, TSTF-505 | 15 December 2022 | 19 September 2023 |
EPID:L-2022-LLR-0085 | Proposed Alternative Associated with a Weld Overlay Repair to the Torus | 8 December 2022 | 30 March 2023 |
EPID:L-2022-LLR-0083 | Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 30 November 2022 | 28 April 2023 |
EPID:L-2022-LRM-0087 | TSTF-505 | 1 November 2022 | 14 December 2022 |
EPID:L-2022-LLA-0153 | TSTF-295 | 25 October 2022 | 21 November 2022 |
EPID:L-2022-LLA-0151 | TSTF-273 | 25 October 2022 | 18 November 2022 |
EPID:L-2022-LLA-0143 | TSTF-306 | 3 October 2022 | 1 May 2023 |
EPID:L-2022-LLA-0124 | 22 September 2022 | 17 November 2022 | |
EPID:L-2021-LLR-0092 | Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. | 20 September 2022 | 16 March 2023 |
EPID:L-2022-LLA-0117 | TSTF-568 | 12 August 2022 | 9 September 2022 |
EPID:L-2022-LLA-0115 | TSTF-577 | 10 August 2022 | 28 December 2022 |
EPID:L-2022-OLL-0005 | 2 August 2022 | 2 August 2022 | |
EPID:L-2022-LLR-0094 | 26 July 2022 | 26 July 2022 | |
EPID:L-2022-LLL-0011 | 19 July 2022 | 30 November 2022 | |
EPID:L-2022-LLA-0094 | License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage | 29 June 2022 | 28 February 2023 |
EPID:L-2021-LRO-0042 | 1 June 2022 | 1 June 2022 | |
EPID:L-2022-LLA-0075 | License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators | 24 May 2022 | 17 April 2023 |
EPID:L-2022-LLA-0057 | R.E.. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes | 18 April 2022 | 23 February 2023 |
EPID:L-2019-LLA-0274 | 31 March 2022 | 31 March 2022 | |
EPID:L-2022-LLR-0029 | E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps | 2 March 2022 | 21 December 2022 |
EPID:L-2022-LLE-0006 | COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements | 4 February 2022 | 4 February 2022 |
EPID:L-2022-LLR-0013 | Proposed Relief Request for Mitigation of Buried Saltwater Piping Degradation | 3 February 2022 | 28 July 2022 |
EPID:L-2022-LLA-0019 | Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report to Add References to NRC-Approved Topical Report with Admin | 24 January 2022 | 31 March 2022 |
EPID:L-2021-LRM-0122 | Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Planned Alterative Request Involving Class 3 Pipe Repair at Calvert Cliffs Nuclear Power Plant | 22 December 2021 | 22 March 2022 |
EPID:L-2021-LLE-0044 | R. E. Ginna Nuclear Power Plant - Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.c | 6 October 2021 | 15 December 2021 |
EPID:L-2021-LRM-0103 | 5 October 2021 | 30 November 2021 | |
EPID:L-2021-LLA-0176 | TSTF-582 TSTF-542 | 30 September 2021 | 4 March 2022 |
EPID:L-2021-LLR-0074 | 30 September 2021 | 30 September 2021 | |
EPID:L-2021-LLE-0042 | COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements | 21 September 2021 | 28 September 2021 |
EPID:L-2021-LLR-0080 | Proposed Alternative Concerning Pressure Testing of ASME Section XI Class 2 Portions of the Auxiliary Feedwater System | 20 September 2021 | 2 May 2022 |
EPID:L-2021-LLR-0066 | Relief Request Associated with Excess Flow Check Valves | 8 September 2021 | 11 March 2022 |
EPID:L-2021-LLR-0057 | Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | 12 August 2021 | 15 April 2022 |