Semantic search
Jump to navigation
Jump to search
Name | Start date | End date | |
---|---|---|---|
EPID:L-2023-LRM-0064 | 19 September 2023 | 19 September 2023 | |
EPID:L-2023-LLA-0077 | TSTF-580 | 25 May 2023 | 21 September 2023 |
EPID:L-2022-LRA-0143 | TSTF-306 | 25 April 2023 | 25 April 2023 |
EPID:L-2023-LLR-0012 | ASME Code Case N-716-3 | 29 March 2023 | 5 April 2023 |
EPID:L-2023-LLR-0017 | Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative | 27 March 2023 | 14 April 2023 |
EPID:L-2023-LLR-0011 | Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 24 March 2023 | 31 March 2023 |
EPID:L-2023-LRM-0009 | 21 February 2023 | 24 March 2023 | |
EPID:L-2023-LRO-0008 | Long Island Power Authority and Long Island Lighting Company Request for Threshold Determination Regarding Nine Mile Point Nuclear Station, Unit No. 2 | 15 February 2023 | 20 April 2023 |
EPID:L-2022-LLA-0186 | TSTF-505 TSTF-3, TSTF-505 | 15 December 2022 | 19 September 2023 |
EPID:L-2022-LLA-0185 | TSTF-505 | 15 December 2022 | 29 May 2023 |
EPID:L-2022-LLR-0085 | Proposed Alternative Associated with a Weld Overlay Repair to the Torus | 8 December 2022 | 30 March 2023 |
EPID:L-2022-LLR-0083 | Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 30 November 2022 | 28 April 2023 |
EPID:L-2022-LRM-0087 | TSTF-505 | 1 November 2022 | 14 December 2022 |
EPID:L-2022-LLA-0153 | TSTF-295 | 25 October 2022 | 21 November 2022 |
EPID:L-2022-LLA-0143 | TSTF-306 | 3 October 2022 | 1 May 2023 |
EPID:L-2022-LLA-0117 | TSTF-568 | 12 August 2022 | 9 September 2022 |
EPID:L-2022-LLR-0094 | 26 July 2022 | 26 July 2022 | |
EPID:L-2022-LLL-0011 | 19 July 2022 | 30 November 2022 | |
EPID:L-2022-LLA-0094 | License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage | 29 June 2022 | 28 February 2023 |
EPID:L-2022-LLA-0075 | License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators | 24 May 2022 | 17 April 2023 |
EPID:L-2022-LLR-0029 | E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps | 2 March 2022 | 21 December 2022 |
EPID:L-2021-LRM-0103 | 5 October 2021 | 30 November 2021 | |
EPID:L-2021-LLA-0176 | TSTF-582 TSTF-542 | 30 September 2021 | 4 March 2022 |
EPID:L-2021-LLR-0066 | Relief Request Associated with Excess Flow Check Valves | 8 September 2021 | 11 March 2022 |
EPID:L-2021-LLR-0057 | Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | 12 August 2021 | 15 April 2022 |
EPID:L-2021-LLA-0121 | TSTF-554 | 3 August 2021 | 13 January 2022 |
EPID:L-2021-LRM-0069 | 13 July 2021 | 30 August 2021 | |
EPID:L-2021-LLA-0169 | TSTF-541 | 30 June 2021 | 29 April 2022 |
EPID:L-2021-LRM-0056 | 4 June 2021 | 6 July 2021 | |
EPID:L-2021-LLA-0096 | TSTF-501 | 26 May 2021 | 15 November 2021 |
EPID:L-2021-OLL-0027 | 19 April 2021 | 17 May 2021 | |
EPID:L-2021-LLE-0014 | 3 March 2021 | 8 April 2021 | |
EPID:L-2021-LLR-0056 | ASME Code Case OMN-28 | 3 March 2021 | 3 September 2021 |
EPID:L-2021-LLE-0006 | COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements | 22 January 2021 | 23 February 2021 |
EPID:L-2020-LRM-0113 | 21 January 2021 | 21 January 2021 | |
CAC:00500 | 8 January 2021 | 3 February 2021 | |
EPID:L-2021-LLR-0000 | Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | 4 January 2021 | 25 June 2021 |
EPID:L-2020-LLA-0276 | TSTF-542 TSTF-582 | 18 December 2020 | 2 November 2021 |
EPID:L-2020-LLR-0153 | 14 December 2020 | 28 April 2021 | |
EPID:L-2018-OLL-0007 | 11 December 2020 | 11 December 2020 | |
EPID:L-2021-LLR-0153 | Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting | 1 December 2020 | 5 August 2021 |
EPID:L-2017-FPR-0013 | Encl: Environmental Assessment Memo to File: Environmental Assessment & Finding of No Significant Impact for Exelon Generation Co. Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Calvert Cliffs ISFSI | 20 November 2020 | 23 November 2020 |
EPID:L-2020-LLR-0147 | ASME Code Case N-893 | 16 November 2020 | 27 October 2021 |
EPID:L-2020-LLE-0195 | Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency | 13 November 2020 | 14 December 2020 |
EPID:L-2020-LRM-0102 | Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting | 23 October 2020 | 10 December 2020 |
EPID:L-2020-LLR-0136 | Relief Requests Associated with Pump Periodic Verification Tests for the Fifth Ten-Year Inservice Test Interval | 8 October 2020 | 3 June 2021 |
EPID:L-2020-LLR-0118 | 22 September 2020 | 22 September 2020 | |
EPID:L-2020-LLR-0114 | 18 September 2020 | 23 February 2021 | |
EPID:L-2020-LLA-0188 | 18 September 2020 | 24 March 2021 | |
EPID:L-2020-LLR-0112 | 17 September 2020 | 22 April 2021 |