Semantic search
Jump to navigation
Jump to search
Name | Start date | End date | |
---|---|---|---|
EPID:L-2023-LLA-0028 | TSTF-554 | 16 February 2023 | 29 August 2023 |
EPID:L-2023-LLR-0018 | Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | 2 February 2023 | 1 May 2023 |
EPID:L-2023-LLR-0003 | Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 23 January 2023 | 26 July 2023 |
EPID:L-2022-LLR-0089 | Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner | 16 December 2022 | 12 May 2023 |
EPID:L-2022-LLA-0146 | Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 4 October 2022 | 22 June 2023 |
EPID:L-2022-LRM-0031 | TSTF-425 TSTF-545 | 20 April 2022 | 10 May 2022 |
EPID:L-2022-LRM-0015 | Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company | 1 February 2022 | 14 September 2022 |
EPID:L-2022-LLA-0011 | TSTF-541 | 18 January 2022 | 14 November 2022 |
EPID:L-2021-LLE-0055 | 15 December 2021 | 9 February 2022 | |
EPID:L-2021-LLA-0230 | SECY-22-0090: Duke Energy Request to Relocate the Emergency Operations Facility | 14 December 2021 | 10 March 2023 |
EPID:L-2021-LLA-0216 | TSTF-580 | 2 December 2021 | 12 May 2022 |
EPID:L-2021-LLE-0050 | Issuance of One-Time Exemption for a Failed Fuel Can in Exceeding Technical Specifications Weight Limit Pertaining to CoC, 1004 Renewed Amendment 17, 61BTH Type 2 Dry Shielded Canister, for Duane Arnold Energy Center ISFSI | 2 December 2021 | 11 February 2022 |
EPID:L-2021-LRM-0112 | 29 November 2021 | 29 December 2021 | |
EPID:L-2021-LLA-0120 | Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool | 1 August 2021 | 25 April 2022 |
EPID:L-2021-LLN-0003 | Request for Approval of NextEra Energy Duane Arnold, Llc'S Decommissioning Quality Assurance Program Revision 0 | 30 July 2021 | 26 April 2022 |
EPID:L-2021-LLE-0035 | Exemption Request for Senior Reactor Operator License Application | 29 July 2021 | 23 November 2021 |
EPID:L-2021-LLA-0107 | License Amendment Request (TSCR-191): Proposed Change to the Physical Security Plan for the Isfsl Only Condition | 3 June 2021 | 10 March 2022 |
EPID:L-2020-LLE-0114 | 11 May 2021 | 11 May 2021 | |
EPID:L-2020-LLE-0115 | 11 May 2021 | 12 May 2021 | |
EPID:L-2021-LLO-0000 | 22 April 2021 | 22 April 2021 | |
EPID:L-2021-LLA-0060 | TSTF-505 | 1 April 2021 | 2 May 2022 |
EPID:L-2021-LLR-0014 | Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1) | 24 February 2021 | 20 December 2021 |
EPID:L-2021-LLA-0022 | Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank Volume | 23 February 2021 | 8 March 2022 |
EPID:L-2021-LLA-0029 | Supplement Information to Technical Specification Amendment Application | 19 February 2021 | 21 January 2022 |
EPID:L-2021-LRM-0013 | TSTF-505 | 10 February 2021 | 1 April 2021 |
EPID:L-2020-LLA-0198 | 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | 4 February 2021 | 26 August 2021 |
EPID:L-2021-LRM-0010 | 22 January 2021 | 3 March 2021 | |
EPID:L-2021-LLL-0000 | SECY-21-0108: Summary of Staff Biennial Review and Findings of the 2021 Decommissioning Funding Status Reports from Operating and Decommissioning Power Reactor Licensees | 13 January 2021 | 12 May 2022 |
EPID:L-2021-LRM-0006 | 7 January 2021 | 24 February 2021 | |
EPID:L-2020-LLE-0241 | Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 Pandemic | 29 December 2020 | 13 January 2021 |
EPID:L-2020-PPM-0015 | DAEC-LIC504-Immediate-Determination-11-02 | 25 December 2020 | 27 May 2021 |
EPID:L-2019-JLD-0005 | EA-13-109 | 9 December 2020 | 9 December 2020 |
EPID:L-2019-JLD-0004 | EA-12-051 | 9 December 2020 | 9 December 2020 |
EPID:L-2019-JLD-0021 | EA-12-049 | 9 December 2020 | 9 December 2020 |
EPID:L-2020-LLR-0156 | Duke Energy Carolinas, LLC - Relief Request for Alternative for Reactor Vessel Closure Stud Examinations | 1 December 2020 | 18 November 2022 |
EPID:L-2020-LLL-0027 | Letter from EPRI to Mr. Scott Wall, BWRVIP 2020-100, 288 Surveillance Capsule Test Results Report | 1 December 2020 | 28 December 2020 |
EPID:L-2020-LLA-0236 | Duane Arn1old, License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition | 29 October 2020 | 3 February 2022 |
EPID:L-2020-LRM-0078 | 30 September 2020 | 30 September 2020 | |
EPID:L-2020-LLA-0218 | TSTF-582 | 24 September 2020 | 4 March 2021 |
EPID:L-2020-LLE-0150 | Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to COVID-19 Pandemic | 22 September 2020 | 25 November 2020 |
EPID:L-2020-LLR-0126 | Duke Energy Carolinas, LLC - Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI in Accordance with 10 CFR 50.55a(g)(4)(iv) | 21 September 2020 | 16 February 2021 |
EPID:L-2020-LLR-0124 | Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) | 16 September 2020 | 6 May 2021 |
EPID:L-2020-LLR-0125 | Duke Energy - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 16 September 2020 | 9 November 2020 |
EPID:L-2020-LLA-0168 | TSTF-568 | 27 July 2020 | 26 January 2021 |
EPID:L-2020-LLA-0166 | TSTF-566 | 21 July 2020 | 18 March 2021 |
EPID:L-2020-LLA-0152 | Nos. 1 & 2 - License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Categorization Process | 9 July 2020 | 30 April 2021 |
EPID:L-2020-LLR-0091 | Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1) | 23 June 2020 | 1 October 2020 |
EPID:L-2020-LLE-0079 | 15 June 2020 | 24 July 2020 | |
EPID:L-2020-LLE-0043 | 20 May 2020 | 26 May 2020 | |
EPID:L-2020-LLE-0042 | 19 May 2020 | 26 May 2020 |