Name | Start date | End date | |
---|---|---|---|
EPID:L-2022-LLA-0164 | 5 May 2023 | 5 May 2023 | |
EPID:L-2023-LLR-0021 | 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | 28 April 2023 | 9 May 2023 |
EPID:L-2023-LRO-0013 | 30 March 2023 | 19 May 2023 | |
EPID:L-2023-LLA-0027 | Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair | 1 March 2023 | 6 March 2023 |
EPID:L-2023-LLA-0036 | Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H | 14 February 2023 | 20 March 2023 |
EPID:L-2023-LLL-0003 | TSTF-448 | 25 January 2023 | 17 May 2023 |
EPID:L-2023-LLA-0006 | Proposed Emergency Plan Revision, Relocation of the Technical Support Center | 13 January 2023 | 8 February 2023 |
EPID:L-2022-LLT-0003 | Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code | 19 December 2022 | 20 June 2023 |
EPID:L-2022-NFO-0005 | 5 December 2022 | 5 December 2022 | |
EPID:L-2022-LLA-0167 | Proposed Emergency Plan Revision - Relocation of the Technical Support Center | 18 November 2022 | 10 May 2023 |
EPID:L-2022-LLR-0081 | Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles | 17 November 2022 | 21 April 2023 |
EPID:L-2022-LLA-0166 | Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times | 7 November 2022 | 31 August 2023 |
EPID:L-2022-LLA-0162 | Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump | 3 November 2022 | 15 March 2023 |
EPID:L-2019-PMP-0039 | TSTF-490 | 15 September 2022 | 27 December 2022 |
EPID:L-2022-LLA-0135 | Request for Fire Protection Program Changes | 6 September 2022 | 16 November 2022 |
EPID:L-2022-LLA-0129 | License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident | 31 August 2022 | 16 May 2023 |
EPID:L-2022-LLA-0118 | License Amendment Request - Proposed Technical Specifications Change for New Fuel and Spent Fuel Storage Areas | 15 August 2022 | 16 November 2022 |
EPID:L-2022-LLD-0006 | 27 July 2022 | 27 July 2022 | |
EPID:L-2022-LLA-0091 | 11 July 2022 | 11 July 2022 | |
EPID:L-2022-LLA-0089 | TSTF-448 | 20 June 2022 | 10 March 2023 |
EPID:L-2022-LLA-0078 | TSTF-554 | 25 May 2022 | 16 June 2023 |
EPID:L-2022-LLA-0071 | Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time | 16 May 2022 | 14 February 2023 |
EPID:L-2022-LLA-0068 | License Amendment Request for Application of Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure | 11 May 2022 | 20 March 2023 |
EPID:L-2022-LLA-0069 | TSTF-547 TSTF-54 | 11 May 2022 | 9 May 2023 |
EPID:L-2022-LRO-0064 | 180-Day Steam Generator Tube Inspection Report | 5 May 2022 | 16 December 2022 |
EPID:L-2022-LLA-0056 | License Amendment Request for NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure | 14 April 2022 | 25 April 2023 |
EPID:L-2022-LRO-0049 | Steam Generator Tube Inspection Report for the Fall 2021 Refueling Outage | 14 April 2022 | 1 November 2022 |
EPID:L-2022-OLL-0003 | 4 April 2022 | 20 May 2022 | |
EPID:L-2022-LLA-0048 | TSTF-501 | 30 March 2022 | 16 March 2023 |
EPID:L-2202-LRM-0028 | 29 March 2022 | 17 May 2022 | |
EPID:L-2022-LLR-0084 | American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 | 15 March 2022 | 25 April 2023 |
EPID:L-2022-LRM-0020 | Notice of Pre-submittal Meeting with Energy Harbor Nuclear Corp. for Beaver Valley Power Station, Units 1 and 2 | 2 March 2022 | 20 April 2022 |
EPID:L-2022-LRM-0014 | 11 February 2022 | 15 March 2022 | |
EPID:L-2022-LRO-0014 | Steam Generator Inspection Report- Fall 2021 Refueling Outage | 10 February 2022 | 13 June 2023 |
EPID:L-2021-LLR-0088 | ASME Section XI Inservice Inspection Program Relief Request N2-14-LMT-003 Fourth Interval Third Period Limited Examinations | 13 December 2021 | 28 July 2022 |
EPID:L-2021-LLR-0086 | ASME Code Case OMN-28 | 16 November 2021 | 8 March 2022 |
EPID:L-2021-LRO-0047 | 9 November 2021 | 9 November 2021 | |
EPID:L-2020-LLA-0229 | 15 October 2021 | 15 October 2021 | |
EPID:L-2021-LLA-0193 | TSTF-554 | 20 September 2021 | 16 November 2021 |
EPID:L-2021-LLA-0220 | TSTF-577 | 15 September 2021 | 2 May 2022 |
EPID:L-2021-LLA-0160 | TSTF-547 | 15 September 2021 | 28 June 2022 |
EPID:L-2021-LLA-0158 | TSTF-577 | 9 September 2021 | 22 March 2022 |
EPID:L-2020-PPM-0005 | 7 September 2021 | 15 July 2022 | |
EPID:L-2021-LLA-0156 | License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation | 29 August 2021 | 1 September 2022 |
EPID:L-2021-LRO-0046 | Steam Generating Tube Inspection Report for the Spring 2021 Refueling Outage | 27 August 2021 | 9 March 2022 |
EPID:L-2021-LLA-0127 | Emergency Plan Safety Evaluation | 14 June 2021 | 7 October 2022 |
EPID:L-2021-LLA-0082 | Proposed License Amendment Request - Revise Primary Grade Water Isolation Time from 15 Minutes to 1 Hour Following Reactor Shutdown | 6 May 2021 | 7 July 2021 |
EPID:L-2021-LLA-0075 | Request for an Amendment to Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) | 26 April 2021 | 10 May 2022 |
EPID:L-2021-LLR-0026 | ASME Code Case OMN-27 | 1 April 2021 | 29 March 2022 |
EPID:L-2021-LLT-0000 | Units 1 and 2, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Modeling Error Correction | 10 March 2021 | 7 September 2022 |