Semantic search
Jump to navigation
Jump to search
Name | Start date | End date | |
---|---|---|---|
EPID:L-2023-LLR-0024 | Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 | 4 May 2023 | 24 May 2023 |
EPID:L-2023-LRO-0028 | 24 April 2023 | 24 April 2023 | |
EPID:L-2023-OLL-0021 | 14 April 2023 | 14 April 2023 | |
EPID:L-2023-LLA-0049 | TSTF-52 | 4 April 2023 | 3 May 2023 |
EPID:L-2022-LRO-0151 | 6 March 2023 | 6 March 2023 | |
EPID:L-2023-LLR-0020 | Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 17 February 2023 | 30 May 2023 |
EPID:L-2023-LLA-0021 | TSTF 505 | 16 February 2023 | 18 April 2023 |
EPID:L-2023-LLA-0028 | TSTF-554 | 16 February 2023 | 29 August 2023 |
EPID:L-2023-LLR-0018 | Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | 2 February 2023 | 1 May 2023 |
EPID:L-2023-LLA-0015 | TSTF-493 TSTF-425 TSTF-545 | 1 February 2023 | 20 June 2023 |
EPID:L-2023-LLR-0003 | Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 23 January 2023 | 26 July 2023 |
EPID:L-2022-LRM-0084 | TSTF-505 | 30 November 2022 | 8 December 2022 |
EPID:L-2022-NFO-0010 | 22 November 2022 | 22 November 2022 | |
EPID:L-2022-LRO-0152 | Refuel 31 (O3R31) Steam Generator Tube Inspection Report | 21 November 2022 | 25 May 2023 |
EPID:L-2022-LRO-0069 | Refuel 30 (O2R30) Steam Generator Tube Inspection Report | 26 May 2022 | 29 November 2022 |
EPID:L-2022-LLR-0060 | Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems. | 19 May 2022 | 26 September 2023 |
EPID:L-2022-LLE-0015 | 16 May 2022 | 16 May 2022 | |
EPID:L-2022-LRM-0031 | TSTF-425 TSTF-545 | 20 April 2022 | 10 May 2022 |
EPID:L-2022-LLA-0050 | TSTF- 359 | 31 March 2022 | 8 December 2022 |
EPID:L-2022-LRO-0141 | End of Cycle 27 (M2R27) Steam Generator Tube Inspection Report | 24 March 2022 | 1 May 2023 |
EPID:L-2022-LLA-0036 | TSTF 569 | 24 March 2022 | 12 September 2022 |
EPID:L-2022-OLL-0012 | 301 Post Exam Comments | 11 March 2022 | 25 March 2022 |
EPID:L-2022-LLA-0011 | TSTF-541 | 18 January 2022 | 14 November 2022 |
EPID:L-2021-LLA-0230 | SECY-22-0090: Duke Energy Request to Relocate the Emergency Operations Facility | 14 December 2021 | 10 March 2023 |
EPID:L-2021-LRM-0112 | 29 November 2021 | 29 December 2021 | |
EPID:L-2021-LLA-0198 | Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Revisions 1, 2, and 3 | 25 October 2021 | 19 July 2022 |
EPID:L-2021-LLR-0028 | 20 September 2021 | 20 September 2021 | |
EPID:L-2021-LLA-0161 | TSTF-577 | 16 September 2021 | 4 March 2022 |
EPID:L-2021-LLA-0157 | Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis | 2 September 2021 | 15 July 2022 |
EPID:L-2020-LLQ-0006 | 27 August 2021 | 5 October 2021 | |
EPID:L-2021-LLA-0232 | 20 August 2021 | 29 November 2022 | |
EPID:L-2021-LLR-0052 | ASME Code Case OMN-22 | 19 August 2021 | 18 February 2022 |
EPID:L-2021-LLR-0055 | 19 August 2021 | 23 February 2022 | |
EPID:L-2021-LLR-0053 | ASME Code Case OMN-26 | 19 August 2021 | 20 December 2021 |
EPID:L-2021-LLR-0051 | 19 August 2021 | 19 August 2021 | |
EPID:L-2021-LRM-0078 | License Amendment Request for Revision 1 of DPC-NE-1007-P, Conditional Exemption of the End-of-Cycle (EOC) Moderator Temperature Coefficient (Mtc) Measurement Methodology | 3 August 2021 | 22 September 2021 |
EPID:L-2021-LRO-0043 | Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report | 2 August 2021 | 18 January 2022 |
EPID:L-2021-LLR-0054 | ASME Code Case OMN-28 | 29 July 2021 | 15 March 2022 |
EPID:L-2021-LLR-0048 | Request to Use Provisions of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) | 1 July 2021 | 16 November 2021 |
EPID:L-2021-LLA-0111 | TSTF-439 | 9 June 2021 | 14 June 2022 |
EPID:L-2021-LLR-0043 | ASME Code Case N-885 | 8 June 2021 | 11 January 2022 |
EPID:L-2021-SLR-0000 | Application for Subsequent Renewed Operating Licenses | 7 June 2021 | 19 December 2022 |
EPID:L-2021-LLR-0034 | Proposed Alternative for Inservice Inspection of Containment Post-Tensioning System Components | 6 May 2021 | 7 December 2021 |
EPID:L-2021-LLR-0032 | ASME Code Case N-853 | 4 May 2021 | 7 February 2022 |
EPID:L-2022-LLR-0010 | SLC Manual Revision to Loes and 16.11-2 | 24 April 2021 | 31 August 2022 |
EPID:L-2021-LRM-0110 | December 7, 2021, Pre-submittal Presentation Regarding Embedded Flaw Repair Relief Request | 23 April 2021 | 14 December 2021 |
EPID:L-2021-NFO-0004 | 16 March 2021 | 26 May 2021 | |
EPID:L-2021-LRM-0033 | ASME Code Case N-853 | 16 March 2021 | 27 April 2021 |
EPID:L-2021-LRO-0002 | Refuel 31 (O1R31) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval | 11 February 2021 | 26 August 2021 |
EPID:L-2020-LLA-0198 | 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | 4 February 2021 | 26 August 2021 |