Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RA-18-129, Technical Specification 5.6.6 Special Report, Inoperability of Post Accident Monitoring Instrument; Containment Sump Wide Range Water Level (CR 02218964) | 23 August 2018 | Technical Specification 5.6.6 Special Report, Inoperability of Post Accident Monitoring Instrument; Containment Sump Wide Range Water Level (CR 02218964) | Post Accident Monitoring |
ONS-2016-098, Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors | 14 November 2016 | Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors | Post Accident Monitoring |
ONS-2015-085, Special Report in Accordance with Selected Licensee Commitment (SLC) 16.7.4, Hydrogen Analyzers | 10 July 2015 | Special Report in Accordance with Selected Licensee Commitment (SLC) 16.7.4, Hydrogen Analyzers | Grab sample |
ONS-2014-159, Special Report Per Selected Licensee Commitment 16.9.9 Auxiliary Service Water (Asw) System and Main Steam Atmospheric Dump Valves and Oconee Transition from the Station Asw System to Protected Service Water System - Revision 3 | 9 February 2015 | Special Report Per Selected Licensee Commitment 16.9.9 Auxiliary Service Water (Asw) System and Main Steam Atmospheric Dump Valves and Oconee Transition from the Station Asw System to Protected Service Water System - Revision 3 | Safe Shutdown Shutdown Margin Probabilistic Risk Assessment Fire Protection Program |
RA-14-0032, CFR 50.46 - 30-Day Report for Estimated Impacts to Peak Cladding Temperature Due to Fuel Pellet Thermal Conductivity Degradation | 17 December 2014 | CFR 50.46 - 30-Day Report for Estimated Impacts to Peak Cladding Temperature Due to Fuel Pellet Thermal Conductivity Degradation | |
ML12073A354 | 9 March 2012 | 30-Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model | |
ML11347A193 | 8 December 2011 | Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model | |
ML100700556 | 3 March 2010 | LER, Oconee, Units 1, 2, & 3, Submittal of 30-Day Report Pursuant to Ground Water Protection Initiative and Ground Water Monitoring Wells GM-7R and GM-7DR | |
ML082320884 | 13 August 2008 | Site, Independent Spent Fuel Storage Instillation (ISFSI) General License Cask Certificate of Compliance, 30-Day Report Due to Higher Canister Heat Loading | |
ML051730463 | 13 June 2005 | Steam Generator Inservice Inspection lEOC22, Steam Generator Tube Plugging and Repair 30-day Report | |
ML050970315 | 31 March 2005 | Special Report Per Technical Specification 5.6.6 Problem Investigation Process No.: 0-05-1567, 0-05-1401 | Post Accident Monitoring |