Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20009F422 | 11 June 1981 | RO 81-1:on 810608,unscheduled Power Outage Resulted in Reactor Shutdown.Caused by Loss of Reactor Control Power, Interrupting Electrical Current to Control Rod Holding Magnets.Magnet Assemblies Returned to Correct Position | |
ML19290B743 | 26 November 1979 | Followup Rept to RO-79-3:on 791116,during Prestartup,Shield Water Level Float Switch Assembly Failed to Initiate Protective Trip Signal.Caused by Gradual Buildup of Corrosion Products in Internal Mechanism of Microswitch | |
ML19273B350 | 13 March 1979 | Followup to RO 79-2 on 790305: Electric Power to Facility Momentarily Interrupted,Causing Shutdown in Form of Silent Reactor Scram.No Corrective Action Feasible |