Semantic search
Jump to navigation
Jump to search
Start date | Title | Topic | |
---|---|---|---|
05000387/FIN-2013005-04 | 31 December 2013 23:59:59 | Inadequate Instrumentation to Implement EALs for Fission Product Barrier Degradation | |
05000387/FIN-2010004-04 | 30 September 2010 23:59:59 | Failure to Accurately Model the Simulator for RPV Level Control Using the Integrated Control System | Reactor Vessel Water Level Power Uprate |
05000387/FIN-2010004-05 | 30 September 2010 23:59:59 | Inadequate Equipment to Measure Freon Concentration and Assess Threshold for an EAL Declaration |