Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000298/1999301 | 9 March 1999 | NRC Operator Licensing Exam Rept 50-298/99-301 (Including Completed & Graded Tests) for Tests Administered on 990212. Exam Results:Four Reactor Operator License Applicants Passed Exam | High Radiation Area Time to boil Squib Locked High Radiation Area Scram Discharge Volume Overtravel Power change Failure to Scram |
ML20246N736 | 20 March 1989 | Exam Rept 50-298/OL-89-01 on 890228-0302.Exam Results:One Senior Reactor Operator & Four Reactor Operators Passed All Portions of Exams.One Reactor Operator Failed Written Exam | |
ML20151W889 | 9 August 1988 | Exam Rept 50-298/OL-88-02 During Wk of 880718.Exam Results: Both Candidates Passed All Portions of Exam & Will Be Issued Appropriate License | Shutdown Margin Generic Fundamentals Examination Fuel cladding |
ML20148M636 | 28 March 1988 | Exam Rept 50-298/OL-88-01 Administered During Wk of 880215. Exam results:11 of 13 Candidates Administered Test Passed All Portions & Will Be Issued Appropriate License | Shutdown Margin High Radiation Area Temporary Modification Squib Scram Discharge Volume Continuous fire watch Fire Watch |
ML20245C469 | 26 October 1987 | Exam Rept 50-298/OL 87-02.Exam Results:Four Senior Reactor Operator Candidates Passed All Portions of Exam.Exam Encl | Shutdown Margin High Radiation Area Fuel cladding |
ML20205C734 | 20 March 1987 | Page 24 of OL Exam Rept 50-298/OL-87-01 | |
ML20212N342 | 6 March 1987 | Exam Rept 50-298/OL-87-01 on 870217.Exam Results:Five Reactor Operator & Three Senior Reactor Operator Candidates Passed All Portions of Exams & Issued Appropriate Licenses. Exam & Answer Key Encl | Shutdown Margin Scram Discharge Volume Overtravel Fuel cladding |
ML20210D191 | 10 September 1986 | Exam Rept 50-298/OL-86-02 on 860602 & 03 & 0807.Exam Results:All Candidates Passed Retake Operating & Written Exams.Exam Answer Key Encl | Scram Discharge Volume Overtravel |
ML20202F774 | 2 April 1986 | Exam Rept 50-298/0L-86-01 on 860303-07.Exam Results:Eight Candidates Passed All Portions of Exam & Three Failed | Loop seal Temporary Modification Scram Discharge Volume Power change Downpower |
ML20138R888 | 8 November 1985 | Exam Rept 50-298/OL-85-04 on 850923-26.Exam Results:Four Senior Reactor Operators Passed Exam & One Failed & Two Reactor Operators Passed Exam & One Failed | Health Physics Network Reactor Vessel Water Level Overtravel Power change |
ML20133D905 | 2 July 1985 | Exam Rept 50-298/OL-85-03 on 850611-14.Exam Results:Seven Reactor Operator & One Senior Reactor Operator Candidates Passed.Comments,Resolutions & Final Exam Encl | Scram Discharge Volume Power change |