Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20245D98522 June 1989Forwards 21 Insp Rept Executive Summaries,Per NRC Contract NRC-03-87-029,Task Order 037.Individual Quality Evaluations of Insp Repts Also PreparedHigh Radiation Area
Fire Barrier
Nondestructive Examination
Continuous fire watch
Fire Protection Program
ML20235M27823 June 1987Forwards TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Crystal River Unit 3, Informal Technical Evaluation Rept.Acceptable Submittals & Responses to Requests for Addl Info Not Provided by Util
ML20214R45517 April 1987Forwards EGG-NTA-7315, Conformance to Generic Ltr 83-28, Item 2.2.1 -- Equipment Classification for All Other Safety- Related Components:Crystal River 3, Final Informal Rept. Plant Conforms to Generic Ltr Item
ML20215J09523 February 1987Forwards EGG-NTA-7443, Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 83-37, Interim Rept
ML20003C25524 February 1981Forwards Interim Rept, Technical Evaluation of Electrical, Instrumentation & Control Design Aspects of Override Containment Purge Valve Isolation & Other Engineered Safety Feature Signals.
ML19308D97324 February 1978Requests Withholding of Certain Engineering Drawings & Specs (Ref 10CFR2.790)
ML19326B25831 July 1973Forwards Dames & Moore Jul 1973 Hurricane Storm Surge Model Computer Listing,Computer Programs EP34 & EP45 & Compilation of Computer Runs for Rept Verification Study
ML19308D69213 December 1971Forwards Summary of Input Assumptions Used in NPSH Calculations,Positive Suction Head Calculation,Evaluation of AEC 701102 Safety Guide 1 & Possible Resolutions If AEC Enforces Safety Guide 1
ML19317G4566 April 1971Forwards Request for Addl Info Re Seismic Design to Complete Review of FSAREarthquake
ML19317G47126 April 1968Confirms Signature of Apr 1968 Rept Per Contract AT(49-5)-2667
ML19317G47722 March 1968Confirms Signature of Rept Per AT(49-5)-2667
ML19329D53228 February 1968Forwards Rept to Aec,Adequacy of Structural Criteria for Crystal River 3 & 4. Notifies That Addl Thought to Be Given Re Attachment of Liner to Angles & Buckling Strength. Suggests Request for Addl Info
ML19329D51520 December 1967Discusses Crystal River PSAR & Requests That List of Questions Be Transmitted to Applicant