Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-20-308, (BVPS) Pre-Draft NPDES Permit No. PA0025615, Comments Submitted in Response to Comments from DEP Received 08/10/2020 | 18 November 2020 | (BVPS) Pre-Draft NPDES Permit No. PA0025615, Comments Submitted in Response to Comments from DEP Received 08/10/2020 | Boric Acid Grab sample |
ML15033A228 | 15 January 2015 | Drawing 8700-RM-0430-006, Piping & Instrumentation Diagram Rw/Sws Chemical Injection System. Revision 6 | |
L-08-292, Lr Drawing 1-21-1, Rev. 7, Main Steam System (Ms). | 24 October 2008 | Lr Drawing 1-21-1, Rev. 7, Main Steam System (Ms). | |
ML082550688 | 8 September 2008 | Drawing, Lr Drawing 1-41C-1, Rev. 5, Domestic Water System (Pl). | |
ML082550686 | 8 September 2008 | Drawing, Lr Drawing 2-34-2, Rev. 3, Station Instrument Air (Ias). | |
ML082550687 | 8 September 2008 | Drawing, Lr Drawing 1-24-2, Rev. 6, Feedwater System (Fw). | |
L-08-262, Drawing, Lr Drawing 2-31-1, Rev. 5, Demineralized Water System (Wtd). | 8 September 2008 | Drawing, Lr Drawing 2-31-1, Rev. 5, Demineralized Water System (Wtd). | |
ML081640603 | 9 June 2008 | Drawing Lr 2-15-6, Rev. 5, Primary Component Coolant System (Ccp). | |
ML081640597 | 9 June 2008 | Drawing Lr 1-25-1, Rev. 5, Steam Generator Blowdown System (Bd). | |
ML081640601 | 9 June 2008 | Drawing Lr 2-14A-1, Rev. 6, Reactor Plant Sample System, (Ssr). | |
ML081640593 | 9 June 2008 | Drawing Lr 1-21-1, Rev. 6, Main Steam System (Ms). | |
ML081640602 | 9 June 2008 | Drawing Lr 2-15-1, Rev. 5, Primary Component Coolant System (Ccp). | |
ML081640595 | 9 June 2008 | Drawing Lr 1-24-2, Rev. 5, Feedwater System (Fw). | |
ML081640592 | 9 June 2008 | Drawing Lr 1-14A-1, Rev. 8, Sample System (Ss). | |
ML081640600 | 9 June 2008 | Drawing Lr 1-58E-1, Rev. 5, ERF Diesel Fuel Oil System (Rgf). | |
ML081640598 | 9 June 2008 | Drawing Lr 1-32-7, Rev. 4, Water Treating System (Wt). | |
ML081640594 | 9 June 2008 | Drawing Lr 1-22-1, Rev. 4, Condensate System (Cn). | |
ML081640596 | 9 June 2008 | Drawing Lr 1-24-3, Rev. 4, Feedwater System (Fw). | |
ML081640604 | 9 June 2008 | Drawing Lr 2-24-2A, Rev. 4, Main Feedwater System (Fws). | |
ML081640599 | 9 June 2008 | Drawing Lr 1-45F-1, Rev. 5, Security Diesel Generator System (Nhs). | |
L-08-189, Drawing Lr 2-27A-2, Rev. 4, Auxiliary Steam and Condensate System (Ass). | 9 June 2008 | Drawing Lr 2-27A-2, Rev. 4, Auxiliary Steam and Condensate System (Ass). | |
L-08-170, Drawing 2-34-11, Rev. 2, Instrument Air Standby Train (Ias). | 19 May 2008 | Drawing 2-34-11, Rev. 2, Instrument Air Standby Train (Ias). | |
ML081440712 | 19 May 2008 | Drawing 2-34-3, Rev. 7, Containment Instrument Air System (Iac). | |
ML081440711 | 19 May 2008 | Drawing 2-34-2, Rev. 2, Station Instrument Air (Ias). | |
ML081440714 | 19 May 2008 | Drawing 2-34-10, Rev. 1, Containment Instrument Air (Iac). | |
L-08-150, Drawing, Lr Drawing LR-Structures, Rev. 2, Site Map - In-Scope Structures. | 8 May 2008 | Drawing, Lr Drawing LR-Structures, Rev. 2, Site Map - In-Scope Structures. | |
ML081410417 | 8 May 2008 | Drawing, Lr Drawing 2-30-1, Rev. 4, Service Water System (SWS) | |
ML081000324 | 3 April 2008 | Drawing Lr 1-08-1, Rev. 4, Boron Recovery Degasifiers. | |
ML081000322 | 3 April 2008 | Drawing Lr 1-07-2, Rev. 4, Chemical and Volume Control System. | |
ML081000330 | 3 April 2008 | Drawing Lr 1-19-1, Rev. 5, Gaseous Waste Disposal System. | |
ML081000328 | 3 April 2008 | Drawing Lr 1-14A-1, Rev. 7, Sample System. | |
ML081000332 | 3 April 2008 | Drawing Lr 1-30-1, Rev. 5, River Water System. | |
ML081000323 | 3 April 2008 | Drawing Lr 1-07-3, Rev. 6, Chemical and Volume Control System. | |
ML081000327 | 3 April 2008 | Drawing Lr 1-12-1, Rev. 5, Containment Vacuum and Leakage Monitoring System. | |
ML081000329 | 3 April 2008 | Drawing Lr 1-14A-2, Rev. 5, Sample System. | |
ML081000326 | 3 April 2008 | Drawing Lr 1-09-2, Rev. 4, Vent and Drain System. | |
ML081000331 | 3 April 2008 | Drawing Lr 1-24-1, Rev. 6, Feedwater System. | |
L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System. | 3 April 2008 | Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System. | |
ML080940397 | 31 March 2008 | Drawing 1-44B-1, Rev. 4, Air Vent and Cooling System (Vs). | |
ML080940399 | 31 March 2008 | Drawing 2-47-1, Rev. 5, Containment Air Locks & Fuel Transfer Tube System (Phs). | |
ML072910105 | 2 November 2007 | Letters to Agencies, Request for List of Protected Species and Essential Fish Habitat within the Area Under Evaluation for the BVPS LRA Review | |
ML072430240 | 27 August 2007 | Drawing 1-12-1, Rev. 4, Containment Vacuum and Leakage Monitoring System (Cv). | |
ML072430239 | 27 August 2007 | Drawing 1-11-2, Rev. 6, Safety Injection System (Si). | |
ML072430238 | 27 August 2007 | Drawing 1-11-1, Rev. 6, Safety Injection System (Si). | |
ML072430235 | 27 August 2007 | Drawing 1-10-1, Rev. 5, Residual Heat Removal System (Rh). | |
ML072430231 | 27 August 2007 | Drawing 1-09-3, Rev. 3, Vent and Drain System (Dv). | Boric Acid |
ML072430228 | 27 August 2007 | Drawing 1-09-2, Rev. 3, Vent and Drain System (Dv). | |
ML072430215 | 27 August 2007 | Drawing 1-08-2, Rev. 3, Boron Recovery Ion Exchangers (Br). | |
ML072430276 | 27 August 2007 | Drawing 1-19-2, Rev. 3, Gaseous Waste Disposal System (Gw). | |
ML072430279 | 27 August 2007 | Drawing 1-20-1, Rev. 3, Fuel Pool Cooling and Purification System (Pc). |