Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20260C204 | 1 May 1985 | Pressurizer Discharge Line. Sheet 1 of 2 | |
ML20260C193 | 14 March 1985 | Relief and Safety Valve Discharge Piping. Sheet 1 of 2 | |
ML20260C188 | 1 September 1984 | Relief and Safety Valve Charging Piping. Sheet 1 of 1 | |
ML20260C198 | 18 July 1984 | Pressurizer Charge Line | |
ML20263L445 | 31 January 1984 | Marked-up Auxiliary Building El 122 Ft Reactor Cont & Fuel Handling Area El 130 Ft Key Plan Fire Protection Mechanical. Drawing Date Illegible | |
ML20263L448 | 31 January 1984 | Marked-up Auxiliary Building,Reactor Containment and Fuel Handling Area El 100 Ft Key Plan Fire Protection Mechanical. Drawing Date Illegible | |
ML20263L450 | 31 January 1984 | Marked-up Aux Bldg El 84 Ft,Reactor Cont 78 Ft & 81 Ft Fuel Handling Area El 85 Ft & 89 Ft 6 Inches Key Plan Fire Protection Mechanical. No Drawing Date | |
ML20263L458 | 31 January 1984 | Marked-up Aux Bldg & Reactor Cont El 64 Ft Key Plan Fire Protection Mechanical. No Drawing Date | |
ML20263L464 | 31 January 1984 | Marked-up Aux Bldg & Reactor Cont El 45 Ft & 55 Ft Key Plan Fire Protection Mechanical. No Drawing Date | |
ML18089A335 | 1 August 1983 | Pass Facilities - El 100 Ft Partial Plan Mechanical. | |
ML20263A650 | 17 September 1982 | Controlled Facilities Building Walkway and Truck Bay Seismic Protection of Storage Tanks Isometric Proposal - Structural | |
ML20262H635 | 2 September 1982 | Unit 2 Aux Bldg Cols FF-MM,14-17.6 Conduits & Trays El 64 Ft Arrangement:Electrical | |
ML20262H622 | 2 September 1982 | Unit 2 Aux Bldg Cols MM-TT,14-17.6 Conduits and Trays El 84 Ft Arrangement:Electrical | |
ML20262H616 | 2 September 1982 | Unit 2 Aux Bldg Cols F-F-MM,14-17.6 Conduits and Trays El 84 Ft Arrangement:Electrical | |
ML20262H611 | 2 September 1982 | Unit 2 Aux Bldg Cols MM-TT,14-17.6 Conduits & Trays El 100 Ft Arrangement:Electrical | |
ML20262H605 | 2 September 1982 | Unit 2 Aux Bldg Cols FF-MM,14-17.6 Conduits & Trays El 100 Ft Arrangement:Electrical | |
ML20262H608 | 2 September 1982 | Unit 2 Aux Bldg Cols MM-TT,14-17.6 Conduits & Trays El 64 Ft Arrangement:Electrical | |
ML20262D465 | 31 August 1982 | Sampling In-Service Inspect Bound Diag Mechanical. No Revision Date | |
ML20262D425 | 23 April 1982 | Residual Heat Removal In-Service Inspect Bound Diag Mechanical | |
ML20262D378 | 30 March 1982 | Fire Protection:In-Service Inspect Bound Diag Mechanical. Sheet 1 | |
ML20262D383 | 30 March 1982 | Fire Protection:In-Service Inspect Bound Diag Mechanical. Sheet 2 | |
ML20262D372 | 25 March 1982 | Chilled Water In-Service Inspect Bound Diag Mechanical | |
ML20262D460 | 6 January 1982 | Auxiliary Feedwater In-Service Inspect Bound Diag Mechanical | |
ML20262D448 | 23 December 1981 | Service Water - Nuclear Area In-Service Inspect Bound Diag Mechanical | |
ML20262D476 | 21 December 1981 | Demineralized Water - Restricted Areas In-Service Inspect Bound Diag Mechanical | |
ML20262D436 | 18 December 1981 | Waste Disposal - Liquid In-Service Inspect Bound Diag Mechanical | |
ML20262D442 | 17 December 1981 | Safety Injection In-Service Inspect Bound Diag Mechanical | |
ML20262D471 | 16 December 1981 | Waste Disposal - Solid In-Service Inspect Bound Diag Mechanical | |
ML20262D431 | 16 December 1981 | Spent Fuel Cooling In-Service Inspect Bound Diag Mechanical | |
ML20262D413 | 14 December 1981 | Chemical & Volume Control Primary Water Recovery In-Service Inspect Bound Diag Mechanical | |
ML20262D354 | 13 December 1981 | Reactor Coolant In-Service Inspect Bound Diag Mechanical | |
ML20262D418 | 12 December 1981 | Component Cooling In-Service Inspect Bound Diag Mechanical | |
ML20262D389 | 12 December 1981 | Steam Generator Drains & Blow Down In-Service Inspect Bound Diag Mechanical | |
ML20262D400 | 12 December 1981 | Chemical & Volume Control Boric Acid Recovery In-Service Inspect Bound Diag Mechanical | Boric Acid |
ML20262D395 | 10 December 1981 | Chemical & Volume Control Operation In-Service Inspect Bound Diag Mechanical | |
ML20262D366 | 8 December 1981 | Main,Reheat & Turbine By-Pass Steam In-Service Inspect Bound Diag Mechanical | |
ML20262D360 | 8 December 1981 | Steam Generator Feed & Condensate In-Service Inspect Bound Diag Mechanical | |
ML20262H624 | 27 November 1981 | Unit 2 Penetration Area El 78 Ft Fire Barriers Valve Cont Ctrs & 480V Press Htr Bus Arrangement:Electrical. Sheet 1 of 1 | Fire Barrier |
ML20262H619 | 27 November 1981 | Unit 2 Aux Bldg Control Area Plan Elev 64 Ft 4KV Swgr Fire Barriers Arrangement:Electrical | Fire Barrier |
ML20262H632 | 25 July 1981 | Unit 2 Aux Bldg Control Area Conduits & Trays El 64 Ft Arrangement:Electrical | |
ML20262H630 | 25 July 1981 | Unit 2 Aux Bldg Mech Penetr Area Conduit & Trays El 78 Ft Arrangement:Electrical | |
ML20262H627 | 25 July 1981 | Unit 2 Penetration Area Trays El 78 Ft Arrangement: Electrical | |
ML20262H613 | 25 July 1981 | Unit 2 Aux Bldg Cols EE-GG,14-17.6 Conduits & Trays El 45 Ft & El 55 Ft Arrangement:Electrical | |
ML20262H603 | 4 June 1981 | Aux Bldg El 84 Ft,Reactor Cont 78 Ft & 81 Ft Fuel Handling Area El 85 Ft & 89 Ft 6 Inches General Arrangement: Mechanical | |
ML18086A752 | 20 August 1980 | Reactor Head Vent Valve Schematic Controls. Actual Drawing Number 248116-B-9676-IR-IEC-0545-C1/1.Sheet 2 | |
ML20263L610 | 7 August 1980 | Reactor Containment Waste Disposal - Liquid West Plan - Els 73 Ft,78 Ft & 81 Ft Arrangement - Insulation Mechanical | |
ML20263L498 | 6 August 1980 | Reactor Containment Service Water Piping Plan Elevations 130 Ft Arrangement - Insulation - Mechanical | |
ML20263L523 | 6 August 1980 | Reactor Containment Component Cooling Piping Sections 78 Ft & 81 Ft Arrangement - Insulation - Mechanical | |
ML20263L559 | 5 August 1980 | Reactor Containment Chemical and Volume Control - Plan Arrangement - Insulation - Mechanical | |
ML20263L577 | 5 August 1980 | Reactor Containment Residual Heat Removal & Safety Inj Piping North Plan Elevation 78 Ft & 81 Ft Arrangement - Insulation - Mechanical |