Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20266E103 | 22 March 1995 | 1/3 P.W.R. Vessel Westinghouse Outlet Nozzle 15.16.17.18 | |
ML20266E088 | 22 March 1995 | Outline Reactor Coolant Pump Duke Power.Sheet 1 of 3.Actual Drawing Number:Mcm 1201.01-0080 | |
ML20266E177 | 22 March 1995 | Auxiliary Building - Unit 1 Plan at El 733'0 Concrete. Sheet 1 | |
ML20266E167 | 22 March 1995 | Auxiliary Building Heat Exchanger Supports Miscellaneous Steel.Sheet 4 | |
ML20266E162 | 22 March 1995 | Valve Assembly 6 INCH,1500 Lb,Gate Valve Cs.Sheet 1 of 1. Actual Drawing Number:Mcm 1205.00-0989 | |
ML20266E073 | 22 March 1995 | Reactor Building Units 1&2 N.S.S.S. Lateral Support Framing Pressurizer - Lower Support Support Plan | |
ML20266E130 | 22 March 1995 | Dbp (as Builts) Clevis.Sheet 4 of 9 | |
ML20266E212 | 22 March 1995 | 14-127 Seal Water Heat Ex | |
ML20266D379 | 22 March 1995 | Flow Diagram of Chemical and Volume Control System Nv | |
ML20266E142 | 22 March 1995 | Dbp as Builts Wall Size,Inside Diameter of Outlet Nozzle and Nozzle Orientation.Sheet 6 of 9 | |
ML20266E270 | 22 March 1995 | 34TH WE Mainsteam Isolation Valve Cylinder Operated.Sheet 1 of 2 | |
ML20266D385 | 22 March 1995 | Flow Diagram of Chemical & Volume Control System Nv | |
ML20266D355 | 22 March 1995 | Flow Diagram of Chemical & Volume Control System Nv | |
ML20266E108 | 22 March 1995 | as Built Dimensions (R.H. Unit).Sheet 1 of 2 | |
ML20266E185 | 22 March 1995 | Diesel Generator Bldg Units 1 & 2 Equipment Supports Miscellaneous Steel.Sheet 4 | |
ML20266E217 | 22 March 1995 | Excess Letdown 4 E | |
ML20266E098 | 22 March 1995 | 1/3 P.W.R. Vessel Westinghouse Inlet Nozzle 11-12-13-14. Sheet 1 of 2 | |
ML20266E113 | 22 March 1995 | as Built Dimensions (L.H. Unit).Sheet 1 of 2.Actual Drawing Number:Mcm 2201.01-0012 | |
ML20266D721 | 22 March 1995 | Flow Diagram of Refueling Water System FW | |
ML20266E226 | 22 March 1995 | Component Cooling Ex.Sheet 5 | |
ML20266E135 | 22 March 1995 | Dbp (as Built) Support Locations Radii of Outlet Nozzle to Internals Seating Surface.Sheet 5 of 9 | |
ML20266E120 | 22 March 1995 | as Built Dimensions (R.H. Unit).Sheet 1 of 2.Actual Drawing Number:Mcm 2201.01-0013 | |
ML20266E244 | 22 March 1995 | Diesel Generator Exchanges.Sheet 1 | |
ML20266E124 | 22 March 1995 | as Built Dimensions (L.H. Unit).Sheet 1 of 2.Actual Drawing Number:Mcm 2201.01-0014 | |
ML20266E288 | 22 March 1995 | Body Assy Relief Valve Power Operated Steam Generator Mcguire Nuc Station 1-2.Sheet 1 of 1.Actual Drawing Number: MCM 1205.09-0011 | |
ML20266D948 | 22 March 1995 | Flow Diagram of Safety Injection System Ni | |
ML20266E181 | 22 March 1995 | Diesel Generator Bldg Units 1 & 2 Equipment Supports Miscellaneous Steel.Sheet 2 | |
ML20266E274 | 22 March 1995 | Illegible Rev to Valve Assembly 6 Inch 150 LB Gate Valve Cs. Sheet 1 of 1 | |
ML20266E156 | 22 March 1995 | CAST Steel Press.Seal NON-RETURN Globe Valve.Sheet 1. Actual Drawing Number:Mcm 1205.00-0095 | |
ML20266E068 | 22 March 1995 | Reactor Building Units 1 & 2 NSSS Support Framing Steam Generator Lower Support Plan | |
ML20266E222 | 11 August 1994 | Component Cooling Ex.Sheet 3 | |
ML20262C791 | 30 April 1994 | Wyoming Department of Environmental Quality Operational Monitoring Locations | |
ML20262C788 | 30 April 1994 | Nuclear Regulatory Commission Opertional Monitoring Locations | |
ML20266D952 | 10 April 1994 | Flow Diagram of Safety Injection System Ni | |
ML20266E255 | 2 March 1994 | Ns Containment Spray Cooler Nozzle Details | |
ML20266E297 | 30 November 1993 | Flow Diagram of Ice Condenser Refrigeration System Nf | |
A00405, Gate Valve Ps Hw | 18 November 1993 | Gate Valve Ps Hw | |
ML20266E152 | 18 November 1993 | Gate VALVE-PS-HW.Sheet 1.Actual Drawing Number: MCM 1205.00-1186 | |
ML20266D828 | 30 September 1993 | Auxiliary Zn A4.Actual Drawing numbers:MC-2414-09.43-02 & MC-2414-09.43-01 | |
ML20266E047 | 11 August 1993 | Flow Diagram of Residual Heat Removal System Nd | |
ML20266E249 | 8 July 1993 | Ns Containment Spray Cooler Partial Section | |
ML20266E063 | 3 March 1993 | QA Condition 1.Sheet 12.Actual Drawing Number: MCM 2201.01-0018 | |
ML20266E207 | 28 January 1993 | Service Residual Heat Removal | |
ML20266D577 | 13 January 1993 | Flow Diagram of Main Steam SM Main Steam Vent to Atmos SV | |
ML20266E265 | 11 January 1993 | Outline of SU1023 - 8X5 Unit Rh Assy Cw Rot with Oil Pump Case 2 in Wider than Std | |
ML20266D620 | 7 January 1993 | Flow Diagram of Auxiliary Feedwater System CA | |
ML20261L283 | 2 December 1992 | Flow Diagram of Refueling Water System (FW) | |
ML20266D967 | 2 December 1992 | Flow Diagram of Safety Injection System Upper Head Ni | |
ML20261L237 | 2 December 1992 | Flow Diagram of Safety Injection System (Ni) | |
ML20261L255 | 2 December 1992 | Flow Diagram of Containment Ventilation Cooling Water System (Rv) |